| Dimension | Kabanga | Kamoa-Kakula | Manono | Loulo-Gounkoto | Lobito Corridor |
|---|---|---|---|---|---|
| Country | Tanzania | DRC | DRC | Mali | Angola / DRC / Zambia |
| Province | East African Rift | Lufilian Arc | Congo Craton | West Africa Birimian | Multi-jurisdiction |
| Commodity | Ni-Cu-Co | Cu | Li-Sn-Ta | Au | Cu-Co + logistics |
| Stage | Pre-FID greenfield | Operating supermajor | Disputed tenure | Operating post-settlement | Operating + expansion |
| Reserve (Mt) | 52.2 SRCD | 466 SRCD | Not consolidated (disputed tenure) ABST · not yet verified | 57.0 SRCD | n/a (infrastructure) |
| Dimension | Kabanga | Kamoa-Kakula | Manono | Loulo-Gounkoto | Lobito Corridor |
|---|---|---|---|---|---|
| A. NPV anchor | US$1,579m post-tax NPV8 (Lifezone FS-TRS, eff. 18 Jul 2025) SRCD | US$5.5–20.2bn across the study's scenario set DRVD | US$1,028m NPV10 (AVZ DFS) SRCD | No asset-level NPV on the record ABST · not yet verified | No NPV on the record ABST · not yet verified |
| D. Discount rate | Not published ABST withdrawn 12 Oct 2026; reader sets the rate |
Not published ABST withdrawn 12 Oct 2026; reader sets the rate |
Not published ABST withdrawn 12 Oct 2026; reader sets the rate |
Not published ABST withdrawn 12 Oct 2026; reader sets the rate |
Not published ABST withdrawn 12 Oct 2026; reader sets the rate |
| Dimension | Kabanga | Kamoa-Kakula | Manono | Loulo-Gounkoto | Lobito Corridor |
|---|---|---|---|---|---|
| ACLED admin1 | Kagera (Tanzania) | Lualaba (DRC) | Tanganyika (DRC) | Kayes (Mali) | 4-segment corridor |
| 12mo events | 4 SRCD | 34 SRCD | 44 SRCD | 302 SRCD | 86 aggregate SRCD |
| Water basin (TNFD) | Kagera River → Lake Victoria basin | Lualaba River → Congo Basin upper | Lualaba tributaries → Congo Basin DRVD | Falémé River → Senegal River basin | Multi-basin transit |
Until this date the page also carried: a province score per asset (the "IC composite"), a severity grade on each ACLED count (LOW to CRITICAL), Afrimintel-assigned materiality tiers against the IFC Performance Standards, the World Bank ESF and the AfDB ISS, a counterparty-eligibility table, and a section of editorial observations. Most of those cells were labelled INF (Inferred), INF-PROP or PEND, which are not states of the Quality Standard. All of them were Afrimintel's own judgements: grades, tiers and eligibility calls. The platform records what the filings say and whether they agree; it does not issue grades or verdicts. They are withdrawn, and described on the audit log.
What remains above is Sourced, Derived or Absent. A cell marked "not yet verified" is Absent: the figure has not been checked against its primary document. Afrimintel publishes no discount rate or risk premium for these assets; each issuer study states the rate its own NPV is reported at, and the reader applies their own.