◢ AFRI M INTEL · decision layer
The decision view
Kabanga Ni (Tanzania)
Kabanga Belt, NW Tanzania · Ni-Cu-Co · Lifezone Metals, via Kabanga Nickel Limited (KNL) holding 84% of Tembo Nickel Corporation Limited (TNCL)
intelligence-grade development
+ Watch
Derived from the deployed data layer at build · dataset v2.28.20 · record reviewed 2026-06-12 · machine-readable: /api/v1/deposits/kabanga-ni.json · ⎙ print / save as PDF
Investment screen DFI · investment house — is this fundable, watchable, or a pass?
Life-cycle stage development Derived
Operating status Pre-FID; mid-2026 FID target; execution readiness phase Sourced
Reserve (P+P) 52.2 Mt @ 1.98% Ni, 0.27% Cu, 0.15% Co Sourced
Reserve basis (verbatim) 100% project basis
Risk-adjusted rate (§10) ~11-12% — pre-FID greenfield development Derived
Value anchors advisory · corporate development — what does the record support?
Resource (M+I) 46.8 Mt @ 2.09% Ni, 0.29% Cu, 0.16% Co Sourced
Resource basis (verbatim) Lifezone-attributable basis (NOT directly comparable to reserve without normalising basis)
Primary source Lifezone Metals Kabanga resource page; Feasibility Study TRS Form 6-K filed 18 July 2025; July 2025 ownership consolidation disclosures [Sourced 2026-05-02] Sourced
Risk read mining major · insurer — what is the exposure?
Province IC composite East African Rift — 5.5/10 Derived
Ownership structure Lifezone 100% of KNL (post-BHP exit July 2025); KNL 84% of TNCL; Government of Tanzania 16% free-carried at TNCL level Sourced
Recent events (record, newest last — tail shown) … rmed between GoT and Lifezone, refinery/beneficiation component finalisation next, FID targeted within 2026 (Directorate of Presidential Communications, State House, 9 June 2026, via TanzaniaInvest, retrieved 2026-06-12) Sourced
Three-state Quality Standard: Sourced / Derived / Absent — no fourth state. Every figure on this page is derived mechanically from the deployed data layer at build time; absent fields are disclosed, never estimated. Risk-adjusted rates render only where the §10 bankability decomposition has been worked and published. Operators/owners named are public-record parties to public assets; no Afrimintel commercial relationship is implied. Screening aid, not an Independent Engineer substitute. Editorial independence: Independence Policy .
Built to survive due diligence.