The decision layer
Request List — what the record does not carry, per asset · Kabanga indicative debt capacity · Catalyst calendar · Point-in-Time Disclosure Record
Eighteen assets rendered to a decision view from the deployed data layer at build time. Intelligence-grade means the reserve/resource record is export-verified; dossier-grade means named primary sources without that export. Both are on this page, and each row carries its label. Absent cells are shown as Absent. Where the record supports a figure, it shows; where it doesn't, the gap is stated.
| Asset | Province | Stage | Reserve |
|---|---|---|---|
| Khoemacau Z5 Cu-Ag · Operating + Expansion underway |
Kalahari Platform | producing | 32.2 Mt |
| Motheo Cu · T3 + A4 producing; A1 in study; maiden Reserve targeted Jun 2026 |
Kalahari Platform | producing | 0.4 Mt |
| Kamoa-Kakula Cu · Operating; Kakula 2.0 mine plan post-May 2025 seismic event |
Lufilian Arc | producing | 13 Mt |
| Tenke Fungurume Cu-Co · Operating at 5-line steady state |
Lufilian Arc | producing | 172.1 Mt |
| Kansanshi Cu · S3 Steady State post-mid-2025 commissioning |
Lufilian Arc | producing | 5.4 Mt |
| Sentinel Cu · Operating; Ball Mill 2 fatigue remediation ongoing |
Lufilian Arc | producing | 3.4 Mt |
| Loulo-Gounkoto Au · Restored — gradual restart phase post-Dec 2025 settlement |
West Africa Birimian | producing | 7.3 Moz |
| Obuasi Au · Phase 3 (5,000 tpd) at nameplate from Dec 2025 |
West Africa Birimian | producing | 6.4 Moz |
| South Deep Au · Operating long-life underground; 85-year LOM |
Kaapvaal Craton | producing | 28 Moz |
| Mogalakwena PGE-Cu-Ni · Operating; Sandsloot Underground trial mining May 2026 |
Kaapvaal Craton | producing | 92 Moz |
| Venetia Diamonds · Underground replacing open pit; KO2 production 2026 |
Kaapvaal Craton | producing | 98.8 Mt |
| Balama Graphite Graphite · Recovered from FM — sub-nameplate operation |
Mozambique Belt | producing | 18 Mt |
| Ngualla REE REE · Pre-production; SML in place; construction start targeted Dec 2025 (status not verified) |
East African Rift | development | 0.9 Mt |
| Kabanga Ni (Tanzania) Ni-Cu-Co · Pre-FID; FID expected Q1 2027 (restated 29 Jul 2026, Lifezone Form 6-K); execution readiness phase |
East African Rift | development | 52.2 Mt |
| Sukari Au (Egypt) Au · Operating with UG Phase 2 expansion at nameplate Q4 2025 |
Arabian-Nubian Shield | producing | 4.2 Moz |
| Kipushi (Ivanhoe) Zn-Ge-Ga · Operating; world's lowest GHG-intensity zinc producer |
Lufilian Arc | producing | 3.4 Mt |
| Manono Lithium District Li-Sn-Ta · Disputed / Split-claim development asset; Manono Lithium SAS (Zijin/Cominière) NE under construction; Dathcom-AVZ South in arbitration |
Congo Craton | unclassified | Absent |
| Colluli Potash SOP · Pre-production under SRBG ownership; construction progress not publicly verified |
Afar Depression | development | 1100 Mt |
Reserve figures computed as tonnage × grade only where both are Sourced single-metal lines; multi-metal and basis-caveated records show tonnage only — open the asset view for the verbatim basis.