AFRIMINTEL — DFI origination screening brief
Screening snapshot v2.136.60 · provenance-stamped · a screening signal, not an underwriting recommendation

‹ DFI screening tools

The four-layer DFI screen

One screening decision, four gates, in the order a development-finance officer actually applies them: is it in our mandate, are the economics real, does it survive downstream risk, and is it financeable now? Pick an institution and watch the universe narrow to a defensible shortlist.

A screen, not an underwriting verdict. Each gate applies a real filter from a named feed and propagates that feed's state — Sourced, Derived, or Pending. The funnel is monotonic: each layer is a strict subset of the one above. Each shortlisted NPV carries its study vintage and age — ≤3y 4–6y >6y — because a study's date bounds how forward-looking its economics are. Shortlist ranks by DFI capital need (High→Low) then NPV; it narrows a universe for origination, the credit decision sits downstream.

European Bank for Reconstruction and Development

Multilateral DFI · screening funnel, 159-asset roster

34In mandatesource ›
Geography gate — within stated countries of operation.
19Bankability-completesource ›
Of the in-mandate set, those with Sourced/Derived published economics (after-tax / pre-tax / PEA).
9Deep risk-assessedsource ›
Of those, assets carrying a downstream verdict (operating-flagship coverage) and/or a per-asset E&S safeguards screen (development-pipeline coverage) — two assessment layers over different universes, counted together. The bankable assets not in either are not-yet-assessed (Pending), not risk-rejected.
9Financeable shortlistsource ›
Of those, the diligence-grade financeability set — sponsor, capital need, funding status, offtake.

Financeable shortlist — 9 assets clearing all four layers (ranked by DFI capital need, then NPV)

EBRD prioritises green-transition / critical minerals. Of the 9-asset shortlist, 1 are green-transition-class (battery/grid/magnet); the rest are geography-eligible but outside that priority. "Green-transition" here is narrower than the broad "critical minerals" sense (which also covers food-security minerals such as potash) used in the financeability commodity_class — complementary lenses, not a contradiction.

AssetBankability (NPV₈)Mandate fitDownstream verdictDFI capital need / fundingTime-to-cashflow
Ewoyaa
Ghana · Li green-transition
US$1,500m Sourced
after-tax · Atlantic Lithium DFS (Jun 2023) + DFS Up 2023 · 3y
EBRD fit: Ghana is in the EBRD accession processPending High Sourced
In transition — Huayou agreeing to sole-fund remaining devel
uncertain HIGH Derived
Assafou
Côte d'Ivoire · Au non-priority
US$1,715m Derived
after-tax · Endeavour Mining Assafou-Dibibango DFS ( 2026 · 0y
EBRD fit: Côte d'Ivoire is an EBRD country of ope…Pending None / N/A N/A
Early works launched (long-lead orders, detailed engineering
~3 yr LOW Derived
Afema
Côte d'Ivoire · Au non-priority
US$1,287m Derived
after-tax · Turaco Gold Afema PFS (17 Jun 2026 ASX a 2026 · 0y
EBRD fit:Pending Total development capital US$410m (incl US$24m contingency + US$32m pre-strip); A$60m cash funds studies to FID; construction/project finance to be arranged toward FID Sourced
PFS-complete (Jun 2026) + maiden Reserve; DFS Q2-2027; first
Doropo
Côte d'Ivoire · Au non-priority
US$1,160m Derived
after-tax · DFS Dec 2025 2025 · 1y
EBRD fit: Côte d'Ivoire is an EBRD country of ope…Pending None / N/A N/A
FID taken Mar 2026; corporate/balance-sheet funded (Resolute
~2 yr LOW Derived
Koné
Côte d'Ivoire · Au non-priority
US$889m Derived
after-tax · FS Jan 2024 2024 · 2y
EBRD fit: Côte d'Ivoire is an EBRD country of ope…Pending Moderate-High Sourced
FULLY FUNDED (Oct 2024 US$825m streaming+loan package); cons
<1 yr LOW Derived
Douta
Senegal · Au non-priority
US$535m Derived
after-tax · Thor Explorations Douta PFS (Jan 2026) 2026 · 0y
EBRD fit:Pending Initial development capital ~US$253.5m; ~US$137m cash on hand (end-2025) + Segilola cashflow; construction financing to be finalised Sourced
PFS-complete + ESIA approved; Mining Convention being finali
Boundiali
Côte d'Ivoire · Au non-priority
US$475m Derived
after-tax · Aurum Boundiali PFS (11 Jun 2026 ASX ann 2026 · 0y
EBRD fit:Pending PFS-stage capex (AACE Class 4 +/-25%) — not captured this cycle; A$40.2m cash funds studies/discovery; construction financing to be arranged toward FID (late-Q4-2026) Sourced
PFS-complete + maiden Reserve + env certificates issued + li
Enchi
Ghana · Au non-priority
US$434m Derived
after-tax · Newcore Gold Enchi PFS (24 Jun 2026 Glob 2026 · 0y
EBRD fit:Pending Upfront capex ~US$351m (5.5Mtpa CIL, 24-month build, contract mining); 'fully funded to complete the PFS'; construction financing to be arranged Sourced
PFS-complete (Jun 2026); mining-lease application this year;
Boumadine
Morocco · AuEq (gold-silver-zinc-lead polymetallic) non-priority
Absent
PEA · Aya Gold & Silver Boumadine PEA (4 Nov 2 2025 · 1y
EBRD fit:Pending Future construction capital not yet defined at FS level; Aya self-funds studies from Zgounder operating cashflow + market; PEA-stage Sourced
PEA-complete (Nov 2025); FS work underway (360,000m infill d

Shortlist = in-mandate ∩ bankability-complete ∩ deep-assessed ∩ financeability set. Mandate-fit column maps each institution to the closest published lens (African multilaterals → african-multilateral fit; IFC and DFC → the Western-DFI/ECA lens, an approximate proxy for IFC as a global multilateral; EBRD → its own accession status). It is a shown signal, not folded into the rank (which is DFI capital need, then NPV). Time-to-cashflow band is Derived editorial. This shortlist narrows a universe for origination; it is not an underwriting recommendation.

African Development Bank

Regional MDB · screening funnel, 159-asset roster

159In mandatesource ›
Geography gate — continent-wide (all African RMC).
83Bankability-completesource ›
Of the in-mandate set, those with Sourced/Derived published economics (after-tax / pre-tax / PEA).
52Deep risk-assessedsource ›
Of those, assets carrying a downstream verdict (operating-flagship coverage) and/or a per-asset E&S safeguards screen (development-pipeline coverage) — two assessment layers over different universes, counted together. The bankable assets not in either are not-yet-assessed (Pending), not risk-rejected.
49Financeable shortlistsource ›
Of those, the diligence-grade financeability set — sponsor, capital need, funding status, offtake.

Financeable shortlist — 49 assets clearing all four layers (ranked by DFI capital need, then NPV)

AssetBankability (NPV₈)Mandate fitDownstream verdictDFI capital need / fundingTime-to-cashflow
Kabanga
Tanzania · Ni-Cu-Co
US$1,579m Sourced
after-tax · Lifezone Metals FS TRS 2025 2025 · 1y
AfDB fit: African jurisdictionPending High Sourced
In progress — DFC/EXIM/JOGMEC + SocGen PF package being fina
~4 yr MEDIUM Derived
Ewoyaa
Ghana · Li
US$1,500m Sourced
after-tax · Atlantic Lithium DFS (Jun 2023) + DFS Up 2023 · 3y
AfDB fit: African jurisdictionPending High Sourced
In transition — Huayou agreeing to sole-fund remaining devel
uncertain HIGH Derived
Kokoseb
Namibia · Au
US$555m Derived
after-tax · vintage Absent
AfDB fit: African jurisdictionPending High Sourced
Equity-funded to date (A$30m placement Aug 2025); constructi
~2 yr LOW-MEDIUM Derived
Ngualla REE
Tanzania · REE
Pending
after-tax · Peak Rare Earths BFS Oct 2022 2022 · 4y
AfDB fit: African jurisdictionno elevated downstream flag captured (some markers Pending) High Sourced
Shenghe-anchored; BFS-stage, FID pending — NdPr price (~$110
3-4+ yr MEDIUM Derived
Toliara (Vara Mada)
Madagascar · Mineral sands (Ti/Zr/REE)
US$1,720m Derived
after-tax · Energy Fuels Toliara/Vara Mada FS (Jan 2 2026 · 0y
AfDB fit:Pending Large (~EUR854m / ~US$900m+ project) but the PARENT is well-capitalized: Energy Fuels raised US$700m convertible notes (Oct 2025, 7x oversubscribed), ~US$900m+ liquidity — the gate is REGULATORY (govt agreement), not capital Sourced
FS-complete; PRE-FID — FID requires a formalised govt invest
Assafou
Côte d'Ivoire · Au
US$1,715m Derived
after-tax · Endeavour Mining Assafou-Dibibango DFS ( 2026 · 0y
AfDB fit: African jurisdictionPending None / N/A N/A
Early works launched (long-lead orders, detailed engineering
~3 yr LOW Derived
Mahenge
Tanzania · graphite
US$1,652m Derived
after-tax · Black Rock Mining eDFS update (FEED 2024 2026 · 0y
AfDB fit:Pending Yes — and largely met: DBSA + IDC + CRDB facilities ~US$179-204m already committed; Module 1 capex ~US$182-231m Sourced
DBSA/IDC/CRDB debt + POSCO equity/offtake-prepayment; early
Kasiya
Malawi · rutile+graphite
≤US$1,448m Sourced
after-tax · Sovereign Metals Kasiya DFS (Apr 2026); 2026 · 0y
AfDB fit:Pending Likely — junior developer, ~US$0.66bn+ initial capex; project finance not yet secured Derived
DFS-funded via A$40m (2025) raise; project financing not yet
Orom-Cross
Uganda · graphite
US$1,411m Derived
after-tax · Blencowe Orom-Cross optimised DFS (May 2 2026 · 0y
AfDB fit:Pending Yes — phased, low capital intensity: Phase 1 ~US$40m (20ktpa concentrate, 1H-2027), Phase 2 ~US$120m (->70ktpa concentrate + 20ktpa USPG); ~US$160-170m total incl downstream beneficiation; P2 expansions from internal cashflow Sourced
DFS-complete + permitted; assembling P1 project finance (~US
Bankan
Guinea · Au
US$1,358m Derived
after-tax · Predictive Discovery Bankan DFS (Jun 202 2025 · 1y
AfDB fit:Pending Capex ~US$463m (incl ~US$34m contingency); producing-asset cashflow supports but does not eliminate external funding; financing process commencing post-DFS Sourced
DFS-complete; ESIA approved; Exploitation Permit in final re
Afema
Côte d'Ivoire · Au
US$1,287m Derived
after-tax · Turaco Gold Afema PFS (17 Jun 2026 ASX a 2026 · 0y
AfDB fit:Pending Total development capital US$410m (incl US$24m contingency + US$32m pre-strip); A$60m cash funds studies to FID; construction/project finance to be arranged toward FID Sourced
PFS-complete (Jun 2026) + maiden Reserve; DFS Q2-2027; first
Doropo
Côte d'Ivoire · Au
US$1,160m Derived
after-tax · DFS Dec 2025 2025 · 1y
AfDB fit: African jurisdictionPending None / N/A N/A
FID taken Mar 2026; corporate/balance-sheet funded (Resolute
~2 yr LOW Derived
Steelpoortdrift
South Africa · Vanadium (V2O5)
US$1,159m Derived
after-tax · VR8 Steelpoortdrift DFS (Oct 2022) 2022 · 4y
AfDB fit:Pending Yes — pre-production capex ~US$211m (Phase 1); seeking strategic equity + construction debt for FID; Rand Merchant Bank (RMB) appointed exclusive financial adviser; exploring brownfield-site acquisition to cut capex Sourced
DFS-complete + fully permitted; pre-FID (financing-gated); n
Etango
Namibia · U3O8
US$1,070m Sourced
after-tax · Bannerman Energy Etango-8 updated DFS (A 2025 · 1y
AfDB fit:Pending Partly filled commercially — CNNC (CNOL) to invest up to US$321.5m for 45% of the JV; build capex ~US$317-353m Sourced
Early works underway; CNNC JV US$321.5m (45%); FID guided 20
Kanyika
Malawi · Niobium (+Ta)
US$1,000m Sourced
after-tax · Globe Kanyika BFS (Apr 2026) 2026 · 0y
AfDB fit:Pending Yes — BFS initial capex ~US$139m (A$197m); phased to cut upfront capital; A$8.67m raised 2025; multiple funding pathways being established; FID targeted 2026 Sourced
BFS-complete + fully permitted + early works begun; pre-FID
Nyanzaga
Tanzania · Au
US$977m Derived
after-tax · vintage Absent
AfDB fit: African jurisdictionPending None / N/A N/A
FID Apr 2025; self-funded (Perseus cash); ~48% construction-
~0.5 yr LOW Derived
Dasa
Niger · U3O8
US$917m Sourced
after-tax · Global Atomic Dasa 2024 Feasibility Stud 2024 · 2y
AfDB fit:Pending Yes — total project cost US$424.6m (2024 DFS); ~US$250m already invested (meets US DFC 40% capital-contribution requirement); seeking a US development-bank loan for ~60% (debt/equity 60/40); US$100m+ still required Sourced
Under construction (~US$250m invested) but financing-gated f
Koné
Côte d'Ivoire · Au
US$889m Derived
after-tax · FS Jan 2024 2024 · 2y
AfDB fit: African jurisdictionPending Moderate-High Sourced
FULLY FUNDED (Oct 2024 US$825m streaming+loan package); cons
<1 yr LOW Derived
Farim
Guinea-Bissau · phosphate
US$673m Derived
after-tax · Itafos Farim FS (May 2023) 2023 · 3y
AfDB fit:Pending Yes — pre-production capex ~US$308m; FID pending for years (parent has prioritised its Brazil [Santana/Araxa] + Idaho [Conda] assets); no FID committed Sourced
FS-complete + fully permitted + ESIA done; PRE-FID (FID long
Bilboes
Zimbabwe · Au
US$582m Sourced
after-tax · Caledonia Bilboes Feasibility Study (Nov 2025 · 1y
AfDB fit:Pending Peak funding requirement ~US$484m, primarily NON-RECOURSE senior debt + Blanket internal equity + royalties/streams/mezzanine/convertibles; NOT DFI-dependent Sourced
FID taken; ADVANCED commercial funding — US$150m convertible
Tumas
Namibia · U3O8
US$577m Sourced
after-tax · Deep Yellow Tumas updated DFS (Apr 2025) 2025 · 1y
AfDB fit:Pending Yes — ~US$474m capex; Nedbank Mandated Lead Arranger for ~US$350m debt; FID price-contingent Sourced
FID deferred Apr 2025 on uranium price; phased early works +
Waterberg
South Africa · PGM
US$569m Sourced
after-tax · Platinum Group Metals Waterberg 2024 DFS 2024 · 2y
AfDB fit:Pending Yes — large bulk-mine capex; financing-gated. Funding to date via equity/ATM; Implats has not funded its share since early 2024 (slight dilution); MISA (Saudi) MoU for potential support of smelter/BMR + project Sourced
DFS-updated + Mining Right; pre-construction; financing-gate
Kangankunde
Malawi · REE (NdPr)
US$555m Sourced
after-tax · Lindian Resources Kangankunde Stage 1 FS 2024 · 2y
AfDB fit:Pending Low and largely met — pre-production capex only ~US$40m; fully funded for Stage 1 via A$91.5m placement (Aug 2025) + Iluka US$20m loan Sourced
Fully funded Stage 1; in construction; first production targ
Twin Hills
Namibia · Au
US$552m Derived
after-tax · DFS 2023 2023 · 3y
AfDB fit: African jurisdictionPending None / N/A N/A
Self-funded (Shanjin); construction commenced Sept 2025; fir
~0.5 yr LOW Derived
Douta
Senegal · Au
US$535m Derived
after-tax · Thor Explorations Douta PFS (Jan 2026) 2026 · 0y
AfDB fit:Pending Initial development capital ~US$253.5m; ~US$137m cash on hand (end-2025) + Segilola cashflow; construction financing to be finalised Sourced
PFS-complete + ESIA approved; Mining Convention being finali
Kobada
Mali · Au
US$500m Sourced
after-tax · Toubani Resources Kobada updated DFS (Ma 2025 · 1y
AfDB fit:Pending Met commercially — A$395m package (Oct 2025): EEA US$160m gold stream + A$125m equity + options; ~US$216m capex; senior-debt process also run Sourced
Fully funded (A$395m); FID taken; construction commenced; fi
K.Hill
Botswana · Mn (battery-grade)
US$481m Sourced
after-tax · Giyani K.Hill DFS (28 May 2026) 2026 · 0y
AfDB fit:Pending Yes — initial capex ~US$535m (incl contingency; total LOP ~US$679m). US EXIM letter of intent US$225m (2025, NON-BINDING, not converted as of the May-2026 DFS); remaining funding gap ~US$310m; IDC of South Africa (convertible loan, combined facilities up to ~ZAR329.9m) + ARCH Sustainable Resources Fund (~US$26m earlier) Sourced
DFS complete (May 2026); pre-construction; financing-gated (
Boundiali
Côte d'Ivoire · Au
US$475m Derived
after-tax · Aurum Boundiali PFS (11 Jun 2026 ASX ann 2026 · 0y
AfDB fit:Pending PFS-stage capex (AACE Class 4 +/-25%) — not captured this cycle; A$40.2m cash funds studies/discovery; construction financing to be arranged toward FID (late-Q4-2026) Sourced
PFS-complete + maiden Reserve + env certificates issued + li
Dugbe
Liberia · Au
US$436m Derived
after-tax · Pasofino Gold Dugbe FS (Jul 2022, NI 43- 2022 · 4y
AfDB fit:Pending Yes — ~US$397-435m construction capex; financing not yet secured; FS being updated to support a 2026 construction decision Sourced
FS-update + pre-construction funding (Nioko/Hummingbird); co
Enchi
Ghana · Au
US$434m Derived
after-tax · Newcore Gold Enchi PFS (24 Jun 2026 Glob 2026 · 0y
AfDB fit:Pending Upfront capex ~US$351m (5.5Mtpa CIL, 24-month build, contract mining); 'fully funded to complete the PFS'; construction financing to be arranged Sourced
PFS-complete (Jun 2026); mining-lease application this year;
Baniaka
Gabon · Fe
US$391m Sourced
after-tax · Genmin Baniaka PFS (16 Nov 2022) 2022 · 4y
AfDB fit:Pending Yes — Stage-1 capex ~US$200m (5Mtpa); funding gap ~US$197.9m; reliant on director/non-exec loans for opex; A$25.7m raised late-2025 Sourced
Fully permitted + early civil works; PRE-DFS / pre-FID (FID
Songwe Hill
Malawi · REE (NdPr)
US$387m Derived
after-tax · Mkango Resources updated DFS (Mar 2026); 2026 · 0y
AfDB fit:Pending Yes — junior; U.S. DFC already funding FEED (US$4.6m, Sep 2025); project-finance package to follow Sourced
DFC FEED funding secured; NASDAQ SPAC merger (Crown PropTech
Chilalo
Tanzania · graphite
US$338m Sourced
after-tax · Evolution Energy Chilalo updated DFS (Ma 2023 · 3y
AfDB fit:Pending Yes — US$120m capex; debt process run by Auramet International; non-binding EOIs from European/African/Tanzanian banks, MULTILATERAL institutions, funds and strategics Sourced
DFS+FEED+ML in hand; FID-ready; financing-gated (debt proces
Makuutu
Uganda · REE (HREE)
US$278m Sourced
after-tax · Ionic Rare Earths Makuutu Stage 1 DFS (M 2023 · 3y
AfDB fit:Pending Yes — ~US$120.8m Stage-1 capex; financing is the explicit gating factor for FID; no DFI/binding finance committed Sourced
DFS + ML in hand; demo plant (Phase 1, Mar 2025) producing M
Muntanga
Zambia · U3O8
US$243m Sourced
after-tax · GoviEx Muntanga FS (23 Jan 2025 results 2025 · 1y
AfDB fit:Pending Yes — capex ~US$282m (heap-leach); financing-gated; LOIs from financing institutions received; advisor (Endeavour Financial) appointed; no DFI named Sourced
FS-complete + fully permitted + ESIA/RAP approved (Jun 2026)
Lofdal
Namibia · REE (HREE: Dy/Tb/Y)
US$232m Derived
after-tax · Namibia Critical Metals Lofdal PFS (Dec 2025 · 1y
AfDB fit:Pending Capex ~US$348m (Dec-2025 PFS, 100%-equity-financed basis); JOGMEC funds the earn-in (C$10m staged + C$3m DFS top-up), can provide non-dilutive Pre-FID capital, and has a ROFR to FULLY FUND through commercial production Sourced
PFS-complete + fully permitted; DFS underway (JOGMEC-funded,
Sanankoro
Mali · Au
US$221m Sourced
after-tax · Cora Gold Sanankoro updated DFS (Sep 202 2025 · 1y
AfDB fit:Pending Met commercially — US$124m capex; fully funded by EEA US$120m gold stream + ~£15.7m EEA-led equity, pending permit Sourced
Fully funded to production (EEA stream + equity), pending th
Ancuabe
Mozambique · graphite
Absent
pre-tax · Triton Ancuabe DFS (Dec 2017 / 2024 upda 2024 · 2y
AfDB fit:Pending Total project cost ~US$90.3m (updated DFS 2024, down from US$99.4m); financing not yet secured; Argonaut financial adviser; FID pending Sourced
DFS-complete + concession + env approval; FID 2025-2026 pend
Bekisopa
Madagascar · Fe
Absent
pre-tax · AKORA Bekisopa PFS (31 Mar 2025) 2025 · 1y
AfDB fit:Pending Low — start-up capex ~US$60.6m (capital-light: contract mining + mobile processing); raised A$2.91m (Aug 2025) for DFS/EIA/permitting; construction financing to be arranged Sourced
PFS-complete; DFS + EIA + mining-licence application underwa
Boumadine
Morocco · AuEq (gold-silver-zinc-lead polymetallic)
Absent
PEA · Aya Gold & Silver Boumadine PEA (4 Nov 2 2025 · 1y
AfDB fit:Pending Future construction capital not yet defined at FS level; Aya self-funds studies from Zgounder operating cashflow + market; PEA-stage Sourced
PEA-complete (Nov 2025); FS work underway (360,000m infill d
Bunyu (Stage 1)
Tanzania · graphite
Absent
pre-tax · Volt Bunyu Stage-1 FS update (Aug 2023) 2023 · 3y
AfDB fit:Pending Revised Stage-1 target capex ~US$37m (40,000 tpa 94% TGC concentrate, US$450/t opex FOB Mtwara); UOF US$11.1m equity conditional on, among others, 70% non-recourse project debt and >=80% bankable offtake Sourced
Development/financing phase; UOF binding term sheet (Dec 202
Epanko
Tanzania · graphite
Absent
pre-tax · EcoGraf Epanko updated BFS (Feb 2026) 2026 · 0y
AfDB fit:Pending Yes, DFI-led — US$181.2m construction + US$18.1m RAP; KfW IPEX-Bank mandated for a US$105m senior secured loan (IER completed); EIB technical assistance; EU infrastructure co-financing Sourced
BFS + IER complete; debt financing advancing (KfW IPEX-led U
Haib
Namibia · Cu
Absent
PEA · Koryx Haib PEA (4 Sep 2025) 2025 · 1y
AfDB fit:Pending Yes, large — PEA upfront capex ~US$1.56bn (incl 10% contingency) for a junior; financing steps come after PFS (late-2026)/DFS Sourced
PEA-complete + updated MRE; ESIA underway; PFS late-2026, th
Kalana
Mali · Au
Absent
after-tax · vintage Absent
AfDB fit: African jurisdictionPending None / N/A N/A
long / stalled HIGH Derived
Kandiolé
Mali · Au
Absent
PEA · Roscan Kandiolé PEA (eff. 27 Feb 2026; N 2026 · 0y
AfDB fit:Pending Initial capital US$218.7m; Roscan has no producing assets; financing discussions to start 2026 Sourced
PEA-complete + env permit granted; mining lease + DFS + fina
Kurmuk
Ethiopia · Au
after-tax · Allied Gold disclosures; Kristie Batten 2026 · 0y
AfDB fit: African jurisdictionPending None / N/A N/A
Self-funded (US$717m budget); pre-commissioning Q2-2026, fir
~0 (imminent) MEDIUM Derived
Minim Martap
Cameroon · bauxite
Absent
pre-tax · Canyon Minim Martap DFS (Aug 2025) 2025 · 1y
AfDB fit:Pending Modest + FUNDED — initial capex ~US$97m; Stage-1 fully financed to first shipment (commercial): ~US$140m AFG Bank Cameroon facility (~US$95m undrawn), A$215m Sept-2025 package (EEA + Afriland), ~A$40m cash Sourced
In construction, Stage-1 FULLY FUNDED to first shipment (Q3
Phalaborwa
South Africa · REE (NdPr+HREE)
Absent
PEA · Rainbow Phalaborwa Interim Study (Dec 20 2024 · 2y
AfDB fit:Pending Yes, US-backed — ~US$326m project; U.S. DFC proposed US$50m investment via TechMet (announced at COP28); US Govt identifies it as a REE supply-chain-independence contributor Sourced
DFS in progress (2026); pilot plant validating flowsheet; fi
Zanaga
Republic of Congo · Fe
Absent
after-tax · Zanaga Iron Ore Company FS (2024 update; 2026 · 0y
AfDB fit:Pending Very large — Apr-2026 update: Stage 1 capex ~US$2.17bn; combined Stage 1+2 ~US$4.05bn; infrastructure-heavy (must build a slurry pipeline + a NEW mining port north of Pointe-Noire; no mineral port exists) Sourced
Permitted + Apr-2026 economic update; pre-construction; pend

Shortlist = in-mandate ∩ bankability-complete ∩ deep-assessed ∩ financeability set. Mandate-fit column maps each institution to the closest published lens (African multilaterals → african-multilateral fit; IFC and DFC → the Western-DFI/ECA lens, an approximate proxy for IFC as a global multilateral; EBRD → its own accession status). It is a shown signal, not folded into the rank (which is DFI capital need, then NPV). Time-to-cashflow band is Derived editorial. This shortlist narrows a universe for origination; it is not an underwriting recommendation.

Africa Finance Corporation

Pan-African MDB · screening funnel, 159-asset roster

159In mandatesource ›
Geography gate — continent-wide (all African RMC).
83Bankability-completesource ›
Of the in-mandate set, those with Sourced/Derived published economics (after-tax / pre-tax / PEA).
52Deep risk-assessedsource ›
Of those, assets carrying a downstream verdict (operating-flagship coverage) and/or a per-asset E&S safeguards screen (development-pipeline coverage) — two assessment layers over different universes, counted together. The bankable assets not in either are not-yet-assessed (Pending), not risk-rejected.
49Financeable shortlistsource ›
Of those, the diligence-grade financeability set — sponsor, capital need, funding status, offtake.

Financeable shortlist — 49 assets clearing all four layers (ranked by DFI capital need, then NPV)

AssetBankability (NPV₈)Mandate fitDownstream verdictDFI capital need / fundingTime-to-cashflow
Kabanga
Tanzania · Ni-Cu-Co
US$1,579m Sourced
after-tax · Lifezone Metals FS TRS 2025 2025 · 1y
AFC fit: African jurisdictionPending High Sourced
In progress — DFC/EXIM/JOGMEC + SocGen PF package being fina
~4 yr MEDIUM Derived
Ewoyaa
Ghana · Li
US$1,500m Sourced
after-tax · Atlantic Lithium DFS (Jun 2023) + DFS Up 2023 · 3y
AFC fit: African jurisdictionPending High Sourced
In transition — Huayou agreeing to sole-fund remaining devel
uncertain HIGH Derived
Kokoseb
Namibia · Au
US$555m Derived
after-tax · vintage Absent
AFC fit: African jurisdictionPending High Sourced
Equity-funded to date (A$30m placement Aug 2025); constructi
~2 yr LOW-MEDIUM Derived
Ngualla REE
Tanzania · REE
Pending
after-tax · Peak Rare Earths BFS Oct 2022 2022 · 4y
AFC fit: African jurisdictionno elevated downstream flag captured (some markers Pending) High Sourced
Shenghe-anchored; BFS-stage, FID pending — NdPr price (~$110
3-4+ yr MEDIUM Derived
Toliara (Vara Mada)
Madagascar · Mineral sands (Ti/Zr/REE)
US$1,720m Derived
after-tax · Energy Fuels Toliara/Vara Mada FS (Jan 2 2026 · 0y
AFC fit:Pending Large (~EUR854m / ~US$900m+ project) but the PARENT is well-capitalized: Energy Fuels raised US$700m convertible notes (Oct 2025, 7x oversubscribed), ~US$900m+ liquidity — the gate is REGULATORY (govt agreement), not capital Sourced
FS-complete; PRE-FID — FID requires a formalised govt invest
Assafou
Côte d'Ivoire · Au
US$1,715m Derived
after-tax · Endeavour Mining Assafou-Dibibango DFS ( 2026 · 0y
AFC fit: African jurisdictionPending None / N/A N/A
Early works launched (long-lead orders, detailed engineering
~3 yr LOW Derived
Mahenge
Tanzania · graphite
US$1,652m Derived
after-tax · Black Rock Mining eDFS update (FEED 2024 2026 · 0y
AFC fit:Pending Yes — and largely met: DBSA + IDC + CRDB facilities ~US$179-204m already committed; Module 1 capex ~US$182-231m Sourced
DBSA/IDC/CRDB debt + POSCO equity/offtake-prepayment; early
Kasiya
Malawi · rutile+graphite
≤US$1,448m Sourced
after-tax · Sovereign Metals Kasiya DFS (Apr 2026); 2026 · 0y
AFC fit:Pending Likely — junior developer, ~US$0.66bn+ initial capex; project finance not yet secured Derived
DFS-funded via A$40m (2025) raise; project financing not yet
Orom-Cross
Uganda · graphite
US$1,411m Derived
after-tax · Blencowe Orom-Cross optimised DFS (May 2 2026 · 0y
AFC fit:Pending Yes — phased, low capital intensity: Phase 1 ~US$40m (20ktpa concentrate, 1H-2027), Phase 2 ~US$120m (->70ktpa concentrate + 20ktpa USPG); ~US$160-170m total incl downstream beneficiation; P2 expansions from internal cashflow Sourced
DFS-complete + permitted; assembling P1 project finance (~US
Bankan
Guinea · Au
US$1,358m Derived
after-tax · Predictive Discovery Bankan DFS (Jun 202 2025 · 1y
AFC fit:Pending Capex ~US$463m (incl ~US$34m contingency); producing-asset cashflow supports but does not eliminate external funding; financing process commencing post-DFS Sourced
DFS-complete; ESIA approved; Exploitation Permit in final re
Afema
Côte d'Ivoire · Au
US$1,287m Derived
after-tax · Turaco Gold Afema PFS (17 Jun 2026 ASX a 2026 · 0y
AFC fit:Pending Total development capital US$410m (incl US$24m contingency + US$32m pre-strip); A$60m cash funds studies to FID; construction/project finance to be arranged toward FID Sourced
PFS-complete (Jun 2026) + maiden Reserve; DFS Q2-2027; first
Doropo
Côte d'Ivoire · Au
US$1,160m Derived
after-tax · DFS Dec 2025 2025 · 1y
AFC fit: African jurisdictionPending None / N/A N/A
FID taken Mar 2026; corporate/balance-sheet funded (Resolute
~2 yr LOW Derived
Steelpoortdrift
South Africa · Vanadium (V2O5)
US$1,159m Derived
after-tax · VR8 Steelpoortdrift DFS (Oct 2022) 2022 · 4y
AFC fit:Pending Yes — pre-production capex ~US$211m (Phase 1); seeking strategic equity + construction debt for FID; Rand Merchant Bank (RMB) appointed exclusive financial adviser; exploring brownfield-site acquisition to cut capex Sourced
DFS-complete + fully permitted; pre-FID (financing-gated); n
Etango
Namibia · U3O8
US$1,070m Sourced
after-tax · Bannerman Energy Etango-8 updated DFS (A 2025 · 1y
AFC fit:Pending Partly filled commercially — CNNC (CNOL) to invest up to US$321.5m for 45% of the JV; build capex ~US$317-353m Sourced
Early works underway; CNNC JV US$321.5m (45%); FID guided 20
Kanyika
Malawi · Niobium (+Ta)
US$1,000m Sourced
after-tax · Globe Kanyika BFS (Apr 2026) 2026 · 0y
AFC fit:Pending Yes — BFS initial capex ~US$139m (A$197m); phased to cut upfront capital; A$8.67m raised 2025; multiple funding pathways being established; FID targeted 2026 Sourced
BFS-complete + fully permitted + early works begun; pre-FID
Nyanzaga
Tanzania · Au
US$977m Derived
after-tax · vintage Absent
AFC fit: African jurisdictionPending None / N/A N/A
FID Apr 2025; self-funded (Perseus cash); ~48% construction-
~0.5 yr LOW Derived
Dasa
Niger · U3O8
US$917m Sourced
after-tax · Global Atomic Dasa 2024 Feasibility Stud 2024 · 2y
AFC fit:Pending Yes — total project cost US$424.6m (2024 DFS); ~US$250m already invested (meets US DFC 40% capital-contribution requirement); seeking a US development-bank loan for ~60% (debt/equity 60/40); US$100m+ still required Sourced
Under construction (~US$250m invested) but financing-gated f
Koné
Côte d'Ivoire · Au
US$889m Derived
after-tax · FS Jan 2024 2024 · 2y
AFC fit: African jurisdictionPending Moderate-High Sourced
FULLY FUNDED (Oct 2024 US$825m streaming+loan package); cons
<1 yr LOW Derived
Farim
Guinea-Bissau · phosphate
US$673m Derived
after-tax · Itafos Farim FS (May 2023) 2023 · 3y
AFC fit:Pending Yes — pre-production capex ~US$308m; FID pending for years (parent has prioritised its Brazil [Santana/Araxa] + Idaho [Conda] assets); no FID committed Sourced
FS-complete + fully permitted + ESIA done; PRE-FID (FID long
Bilboes
Zimbabwe · Au
US$582m Sourced
after-tax · Caledonia Bilboes Feasibility Study (Nov 2025 · 1y
AFC fit:Pending Peak funding requirement ~US$484m, primarily NON-RECOURSE senior debt + Blanket internal equity + royalties/streams/mezzanine/convertibles; NOT DFI-dependent Sourced
FID taken; ADVANCED commercial funding — US$150m convertible
Tumas
Namibia · U3O8
US$577m Sourced
after-tax · Deep Yellow Tumas updated DFS (Apr 2025) 2025 · 1y
AFC fit:Pending Yes — ~US$474m capex; Nedbank Mandated Lead Arranger for ~US$350m debt; FID price-contingent Sourced
FID deferred Apr 2025 on uranium price; phased early works +
Waterberg
South Africa · PGM
US$569m Sourced
after-tax · Platinum Group Metals Waterberg 2024 DFS 2024 · 2y
AFC fit:Pending Yes — large bulk-mine capex; financing-gated. Funding to date via equity/ATM; Implats has not funded its share since early 2024 (slight dilution); MISA (Saudi) MoU for potential support of smelter/BMR + project Sourced
DFS-updated + Mining Right; pre-construction; financing-gate
Kangankunde
Malawi · REE (NdPr)
US$555m Sourced
after-tax · Lindian Resources Kangankunde Stage 1 FS 2024 · 2y
AFC fit:Pending Low and largely met — pre-production capex only ~US$40m; fully funded for Stage 1 via A$91.5m placement (Aug 2025) + Iluka US$20m loan Sourced
Fully funded Stage 1; in construction; first production targ
Twin Hills
Namibia · Au
US$552m Derived
after-tax · DFS 2023 2023 · 3y
AFC fit: African jurisdictionPending None / N/A N/A
Self-funded (Shanjin); construction commenced Sept 2025; fir
~0.5 yr LOW Derived
Douta
Senegal · Au
US$535m Derived
after-tax · Thor Explorations Douta PFS (Jan 2026) 2026 · 0y
AFC fit:Pending Initial development capital ~US$253.5m; ~US$137m cash on hand (end-2025) + Segilola cashflow; construction financing to be finalised Sourced
PFS-complete + ESIA approved; Mining Convention being finali
Kobada
Mali · Au
US$500m Sourced
after-tax · Toubani Resources Kobada updated DFS (Ma 2025 · 1y
AFC fit:Pending Met commercially — A$395m package (Oct 2025): EEA US$160m gold stream + A$125m equity + options; ~US$216m capex; senior-debt process also run Sourced
Fully funded (A$395m); FID taken; construction commenced; fi
K.Hill
Botswana · Mn (battery-grade)
US$481m Sourced
after-tax · Giyani K.Hill DFS (28 May 2026) 2026 · 0y
AFC fit:Pending Yes — initial capex ~US$535m (incl contingency; total LOP ~US$679m). US EXIM letter of intent US$225m (2025, NON-BINDING, not converted as of the May-2026 DFS); remaining funding gap ~US$310m; IDC of South Africa (convertible loan, combined facilities up to ~ZAR329.9m) + ARCH Sustainable Resources Fund (~US$26m earlier) Sourced
DFS complete (May 2026); pre-construction; financing-gated (
Boundiali
Côte d'Ivoire · Au
US$475m Derived
after-tax · Aurum Boundiali PFS (11 Jun 2026 ASX ann 2026 · 0y
AFC fit:Pending PFS-stage capex (AACE Class 4 +/-25%) — not captured this cycle; A$40.2m cash funds studies/discovery; construction financing to be arranged toward FID (late-Q4-2026) Sourced
PFS-complete + maiden Reserve + env certificates issued + li
Dugbe
Liberia · Au
US$436m Derived
after-tax · Pasofino Gold Dugbe FS (Jul 2022, NI 43- 2022 · 4y
AFC fit:Pending Yes — ~US$397-435m construction capex; financing not yet secured; FS being updated to support a 2026 construction decision Sourced
FS-update + pre-construction funding (Nioko/Hummingbird); co
Enchi
Ghana · Au
US$434m Derived
after-tax · Newcore Gold Enchi PFS (24 Jun 2026 Glob 2026 · 0y
AFC fit:Pending Upfront capex ~US$351m (5.5Mtpa CIL, 24-month build, contract mining); 'fully funded to complete the PFS'; construction financing to be arranged Sourced
PFS-complete (Jun 2026); mining-lease application this year;
Baniaka
Gabon · Fe
US$391m Sourced
after-tax · Genmin Baniaka PFS (16 Nov 2022) 2022 · 4y
AFC fit:Pending Yes — Stage-1 capex ~US$200m (5Mtpa); funding gap ~US$197.9m; reliant on director/non-exec loans for opex; A$25.7m raised late-2025 Sourced
Fully permitted + early civil works; PRE-DFS / pre-FID (FID
Songwe Hill
Malawi · REE (NdPr)
US$387m Derived
after-tax · Mkango Resources updated DFS (Mar 2026); 2026 · 0y
AFC fit:Pending Yes — junior; U.S. DFC already funding FEED (US$4.6m, Sep 2025); project-finance package to follow Sourced
DFC FEED funding secured; NASDAQ SPAC merger (Crown PropTech
Chilalo
Tanzania · graphite
US$338m Sourced
after-tax · Evolution Energy Chilalo updated DFS (Ma 2023 · 3y
AFC fit:Pending Yes — US$120m capex; debt process run by Auramet International; non-binding EOIs from European/African/Tanzanian banks, MULTILATERAL institutions, funds and strategics Sourced
DFS+FEED+ML in hand; FID-ready; financing-gated (debt proces
Makuutu
Uganda · REE (HREE)
US$278m Sourced
after-tax · Ionic Rare Earths Makuutu Stage 1 DFS (M 2023 · 3y
AFC fit:Pending Yes — ~US$120.8m Stage-1 capex; financing is the explicit gating factor for FID; no DFI/binding finance committed Sourced
DFS + ML in hand; demo plant (Phase 1, Mar 2025) producing M
Muntanga
Zambia · U3O8
US$243m Sourced
after-tax · GoviEx Muntanga FS (23 Jan 2025 results 2025 · 1y
AFC fit:Pending Yes — capex ~US$282m (heap-leach); financing-gated; LOIs from financing institutions received; advisor (Endeavour Financial) appointed; no DFI named Sourced
FS-complete + fully permitted + ESIA/RAP approved (Jun 2026)
Lofdal
Namibia · REE (HREE: Dy/Tb/Y)
US$232m Derived
after-tax · Namibia Critical Metals Lofdal PFS (Dec 2025 · 1y
AFC fit:Pending Capex ~US$348m (Dec-2025 PFS, 100%-equity-financed basis); JOGMEC funds the earn-in (C$10m staged + C$3m DFS top-up), can provide non-dilutive Pre-FID capital, and has a ROFR to FULLY FUND through commercial production Sourced
PFS-complete + fully permitted; DFS underway (JOGMEC-funded,
Sanankoro
Mali · Au
US$221m Sourced
after-tax · Cora Gold Sanankoro updated DFS (Sep 202 2025 · 1y
AFC fit:Pending Met commercially — US$124m capex; fully funded by EEA US$120m gold stream + ~£15.7m EEA-led equity, pending permit Sourced
Fully funded to production (EEA stream + equity), pending th
Ancuabe
Mozambique · graphite
Absent
pre-tax · Triton Ancuabe DFS (Dec 2017 / 2024 upda 2024 · 2y
AFC fit:Pending Total project cost ~US$90.3m (updated DFS 2024, down from US$99.4m); financing not yet secured; Argonaut financial adviser; FID pending Sourced
DFS-complete + concession + env approval; FID 2025-2026 pend
Bekisopa
Madagascar · Fe
Absent
pre-tax · AKORA Bekisopa PFS (31 Mar 2025) 2025 · 1y
AFC fit:Pending Low — start-up capex ~US$60.6m (capital-light: contract mining + mobile processing); raised A$2.91m (Aug 2025) for DFS/EIA/permitting; construction financing to be arranged Sourced
PFS-complete; DFS + EIA + mining-licence application underwa
Boumadine
Morocco · AuEq (gold-silver-zinc-lead polymetallic)
Absent
PEA · Aya Gold & Silver Boumadine PEA (4 Nov 2 2025 · 1y
AFC fit:Pending Future construction capital not yet defined at FS level; Aya self-funds studies from Zgounder operating cashflow + market; PEA-stage Sourced
PEA-complete (Nov 2025); FS work underway (360,000m infill d
Bunyu (Stage 1)
Tanzania · graphite
Absent
pre-tax · Volt Bunyu Stage-1 FS update (Aug 2023) 2023 · 3y
AFC fit:Pending Revised Stage-1 target capex ~US$37m (40,000 tpa 94% TGC concentrate, US$450/t opex FOB Mtwara); UOF US$11.1m equity conditional on, among others, 70% non-recourse project debt and >=80% bankable offtake Sourced
Development/financing phase; UOF binding term sheet (Dec 202
Epanko
Tanzania · graphite
Absent
pre-tax · EcoGraf Epanko updated BFS (Feb 2026) 2026 · 0y
AFC fit:Pending Yes, DFI-led — US$181.2m construction + US$18.1m RAP; KfW IPEX-Bank mandated for a US$105m senior secured loan (IER completed); EIB technical assistance; EU infrastructure co-financing Sourced
BFS + IER complete; debt financing advancing (KfW IPEX-led U
Haib
Namibia · Cu
Absent
PEA · Koryx Haib PEA (4 Sep 2025) 2025 · 1y
AFC fit:Pending Yes, large — PEA upfront capex ~US$1.56bn (incl 10% contingency) for a junior; financing steps come after PFS (late-2026)/DFS Sourced
PEA-complete + updated MRE; ESIA underway; PFS late-2026, th
Kalana
Mali · Au
Absent
after-tax · vintage Absent
AFC fit: African jurisdictionPending None / N/A N/A
long / stalled HIGH Derived
Kandiolé
Mali · Au
Absent
PEA · Roscan Kandiolé PEA (eff. 27 Feb 2026; N 2026 · 0y
AFC fit:Pending Initial capital US$218.7m; Roscan has no producing assets; financing discussions to start 2026 Sourced
PEA-complete + env permit granted; mining lease + DFS + fina
Kurmuk
Ethiopia · Au
after-tax · Allied Gold disclosures; Kristie Batten 2026 · 0y
AFC fit: African jurisdictionPending None / N/A N/A
Self-funded (US$717m budget); pre-commissioning Q2-2026, fir
~0 (imminent) MEDIUM Derived
Minim Martap
Cameroon · bauxite
Absent
pre-tax · Canyon Minim Martap DFS (Aug 2025) 2025 · 1y
AFC fit:Pending Modest + FUNDED — initial capex ~US$97m; Stage-1 fully financed to first shipment (commercial): ~US$140m AFG Bank Cameroon facility (~US$95m undrawn), A$215m Sept-2025 package (EEA + Afriland), ~A$40m cash Sourced
In construction, Stage-1 FULLY FUNDED to first shipment (Q3
Phalaborwa
South Africa · REE (NdPr+HREE)
Absent
PEA · Rainbow Phalaborwa Interim Study (Dec 20 2024 · 2y
AFC fit:Pending Yes, US-backed — ~US$326m project; U.S. DFC proposed US$50m investment via TechMet (announced at COP28); US Govt identifies it as a REE supply-chain-independence contributor Sourced
DFS in progress (2026); pilot plant validating flowsheet; fi
Zanaga
Republic of Congo · Fe
Absent
after-tax · Zanaga Iron Ore Company FS (2024 update; 2026 · 0y
AFC fit:Pending Very large — Apr-2026 update: Stage 1 capex ~US$2.17bn; combined Stage 1+2 ~US$4.05bn; infrastructure-heavy (must build a slurry pipeline + a NEW mining port north of Pointe-Noire; no mineral port exists) Sourced
Permitted + Apr-2026 economic update; pre-construction; pend

Shortlist = in-mandate ∩ bankability-complete ∩ deep-assessed ∩ financeability set. Mandate-fit column maps each institution to the closest published lens (African multilaterals → african-multilateral fit; IFC and DFC → the Western-DFI/ECA lens, an approximate proxy for IFC as a global multilateral; EBRD → its own accession status). It is a shown signal, not folded into the rank (which is DFI capital need, then NPV). Time-to-cashflow band is Derived editorial. This shortlist narrows a universe for origination; it is not an underwriting recommendation.

African Export-Import Bank

Pan-African MDB · screening funnel, 159-asset roster

159In mandatesource ›
Geography gate — continent-wide (all African RMC).
83Bankability-completesource ›
Of the in-mandate set, those with Sourced/Derived published economics (after-tax / pre-tax / PEA).
52Deep risk-assessedsource ›
Of those, assets carrying a downstream verdict (operating-flagship coverage) and/or a per-asset E&S safeguards screen (development-pipeline coverage) — two assessment layers over different universes, counted together. The bankable assets not in either are not-yet-assessed (Pending), not risk-rejected.
49Financeable shortlistsource ›
Of those, the diligence-grade financeability set — sponsor, capital need, funding status, offtake.

Financeable shortlist — 49 assets clearing all four layers (ranked by DFI capital need, then NPV)

AssetBankability (NPV₈)Mandate fitDownstream verdictDFI capital need / fundingTime-to-cashflow
Kabanga
Tanzania · Ni-Cu-Co
US$1,579m Sourced
after-tax · Lifezone Metals FS TRS 2025 2025 · 1y
Afreximbank fit: African jurisdictionPending High Sourced
In progress — DFC/EXIM/JOGMEC + SocGen PF package being fina
~4 yr MEDIUM Derived
Ewoyaa
Ghana · Li
US$1,500m Sourced
after-tax · Atlantic Lithium DFS (Jun 2023) + DFS Up 2023 · 3y
Afreximbank fit: African jurisdictionPending High Sourced
In transition — Huayou agreeing to sole-fund remaining devel
uncertain HIGH Derived
Kokoseb
Namibia · Au
US$555m Derived
after-tax · vintage Absent
Afreximbank fit: African jurisdictionPending High Sourced
Equity-funded to date (A$30m placement Aug 2025); constructi
~2 yr LOW-MEDIUM Derived
Ngualla REE
Tanzania · REE
Pending
after-tax · Peak Rare Earths BFS Oct 2022 2022 · 4y
Afreximbank fit: African jurisdictionno elevated downstream flag captured (some markers Pending) High Sourced
Shenghe-anchored; BFS-stage, FID pending — NdPr price (~$110
3-4+ yr MEDIUM Derived
Toliara (Vara Mada)
Madagascar · Mineral sands (Ti/Zr/REE)
US$1,720m Derived
after-tax · Energy Fuels Toliara/Vara Mada FS (Jan 2 2026 · 0y
Afreximbank fit:Pending Large (~EUR854m / ~US$900m+ project) but the PARENT is well-capitalized: Energy Fuels raised US$700m convertible notes (Oct 2025, 7x oversubscribed), ~US$900m+ liquidity — the gate is REGULATORY (govt agreement), not capital Sourced
FS-complete; PRE-FID — FID requires a formalised govt invest
Assafou
Côte d'Ivoire · Au
US$1,715m Derived
after-tax · Endeavour Mining Assafou-Dibibango DFS ( 2026 · 0y
Afreximbank fit: African jurisdictionPending None / N/A N/A
Early works launched (long-lead orders, detailed engineering
~3 yr LOW Derived
Mahenge
Tanzania · graphite
US$1,652m Derived
after-tax · Black Rock Mining eDFS update (FEED 2024 2026 · 0y
Afreximbank fit:Pending Yes — and largely met: DBSA + IDC + CRDB facilities ~US$179-204m already committed; Module 1 capex ~US$182-231m Sourced
DBSA/IDC/CRDB debt + POSCO equity/offtake-prepayment; early
Kasiya
Malawi · rutile+graphite
≤US$1,448m Sourced
after-tax · Sovereign Metals Kasiya DFS (Apr 2026); 2026 · 0y
Afreximbank fit:Pending Likely — junior developer, ~US$0.66bn+ initial capex; project finance not yet secured Derived
DFS-funded via A$40m (2025) raise; project financing not yet
Orom-Cross
Uganda · graphite
US$1,411m Derived
after-tax · Blencowe Orom-Cross optimised DFS (May 2 2026 · 0y
Afreximbank fit:Pending Yes — phased, low capital intensity: Phase 1 ~US$40m (20ktpa concentrate, 1H-2027), Phase 2 ~US$120m (->70ktpa concentrate + 20ktpa USPG); ~US$160-170m total incl downstream beneficiation; P2 expansions from internal cashflow Sourced
DFS-complete + permitted; assembling P1 project finance (~US
Bankan
Guinea · Au
US$1,358m Derived
after-tax · Predictive Discovery Bankan DFS (Jun 202 2025 · 1y
Afreximbank fit:Pending Capex ~US$463m (incl ~US$34m contingency); producing-asset cashflow supports but does not eliminate external funding; financing process commencing post-DFS Sourced
DFS-complete; ESIA approved; Exploitation Permit in final re
Afema
Côte d'Ivoire · Au
US$1,287m Derived
after-tax · Turaco Gold Afema PFS (17 Jun 2026 ASX a 2026 · 0y
Afreximbank fit:Pending Total development capital US$410m (incl US$24m contingency + US$32m pre-strip); A$60m cash funds studies to FID; construction/project finance to be arranged toward FID Sourced
PFS-complete (Jun 2026) + maiden Reserve; DFS Q2-2027; first
Doropo
Côte d'Ivoire · Au
US$1,160m Derived
after-tax · DFS Dec 2025 2025 · 1y
Afreximbank fit: African jurisdictionPending None / N/A N/A
FID taken Mar 2026; corporate/balance-sheet funded (Resolute
~2 yr LOW Derived
Steelpoortdrift
South Africa · Vanadium (V2O5)
US$1,159m Derived
after-tax · VR8 Steelpoortdrift DFS (Oct 2022) 2022 · 4y
Afreximbank fit:Pending Yes — pre-production capex ~US$211m (Phase 1); seeking strategic equity + construction debt for FID; Rand Merchant Bank (RMB) appointed exclusive financial adviser; exploring brownfield-site acquisition to cut capex Sourced
DFS-complete + fully permitted; pre-FID (financing-gated); n
Etango
Namibia · U3O8
US$1,070m Sourced
after-tax · Bannerman Energy Etango-8 updated DFS (A 2025 · 1y
Afreximbank fit:Pending Partly filled commercially — CNNC (CNOL) to invest up to US$321.5m for 45% of the JV; build capex ~US$317-353m Sourced
Early works underway; CNNC JV US$321.5m (45%); FID guided 20
Kanyika
Malawi · Niobium (+Ta)
US$1,000m Sourced
after-tax · Globe Kanyika BFS (Apr 2026) 2026 · 0y
Afreximbank fit:Pending Yes — BFS initial capex ~US$139m (A$197m); phased to cut upfront capital; A$8.67m raised 2025; multiple funding pathways being established; FID targeted 2026 Sourced
BFS-complete + fully permitted + early works begun; pre-FID
Nyanzaga
Tanzania · Au
US$977m Derived
after-tax · vintage Absent
Afreximbank fit: African jurisdictionPending None / N/A N/A
FID Apr 2025; self-funded (Perseus cash); ~48% construction-
~0.5 yr LOW Derived
Dasa
Niger · U3O8
US$917m Sourced
after-tax · Global Atomic Dasa 2024 Feasibility Stud 2024 · 2y
Afreximbank fit:Pending Yes — total project cost US$424.6m (2024 DFS); ~US$250m already invested (meets US DFC 40% capital-contribution requirement); seeking a US development-bank loan for ~60% (debt/equity 60/40); US$100m+ still required Sourced
Under construction (~US$250m invested) but financing-gated f
Koné
Côte d'Ivoire · Au
US$889m Derived
after-tax · FS Jan 2024 2024 · 2y
Afreximbank fit: African jurisdictionPending Moderate-High Sourced
FULLY FUNDED (Oct 2024 US$825m streaming+loan package); cons
<1 yr LOW Derived
Farim
Guinea-Bissau · phosphate
US$673m Derived
after-tax · Itafos Farim FS (May 2023) 2023 · 3y
Afreximbank fit:Pending Yes — pre-production capex ~US$308m; FID pending for years (parent has prioritised its Brazil [Santana/Araxa] + Idaho [Conda] assets); no FID committed Sourced
FS-complete + fully permitted + ESIA done; PRE-FID (FID long
Bilboes
Zimbabwe · Au
US$582m Sourced
after-tax · Caledonia Bilboes Feasibility Study (Nov 2025 · 1y
Afreximbank fit:Pending Peak funding requirement ~US$484m, primarily NON-RECOURSE senior debt + Blanket internal equity + royalties/streams/mezzanine/convertibles; NOT DFI-dependent Sourced
FID taken; ADVANCED commercial funding — US$150m convertible
Tumas
Namibia · U3O8
US$577m Sourced
after-tax · Deep Yellow Tumas updated DFS (Apr 2025) 2025 · 1y
Afreximbank fit:Pending Yes — ~US$474m capex; Nedbank Mandated Lead Arranger for ~US$350m debt; FID price-contingent Sourced
FID deferred Apr 2025 on uranium price; phased early works +
Waterberg
South Africa · PGM
US$569m Sourced
after-tax · Platinum Group Metals Waterberg 2024 DFS 2024 · 2y
Afreximbank fit:Pending Yes — large bulk-mine capex; financing-gated. Funding to date via equity/ATM; Implats has not funded its share since early 2024 (slight dilution); MISA (Saudi) MoU for potential support of smelter/BMR + project Sourced
DFS-updated + Mining Right; pre-construction; financing-gate
Kangankunde
Malawi · REE (NdPr)
US$555m Sourced
after-tax · Lindian Resources Kangankunde Stage 1 FS 2024 · 2y
Afreximbank fit:Pending Low and largely met — pre-production capex only ~US$40m; fully funded for Stage 1 via A$91.5m placement (Aug 2025) + Iluka US$20m loan Sourced
Fully funded Stage 1; in construction; first production targ
Twin Hills
Namibia · Au
US$552m Derived
after-tax · DFS 2023 2023 · 3y
Afreximbank fit: African jurisdictionPending None / N/A N/A
Self-funded (Shanjin); construction commenced Sept 2025; fir
~0.5 yr LOW Derived
Douta
Senegal · Au
US$535m Derived
after-tax · Thor Explorations Douta PFS (Jan 2026) 2026 · 0y
Afreximbank fit:Pending Initial development capital ~US$253.5m; ~US$137m cash on hand (end-2025) + Segilola cashflow; construction financing to be finalised Sourced
PFS-complete + ESIA approved; Mining Convention being finali
Kobada
Mali · Au
US$500m Sourced
after-tax · Toubani Resources Kobada updated DFS (Ma 2025 · 1y
Afreximbank fit:Pending Met commercially — A$395m package (Oct 2025): EEA US$160m gold stream + A$125m equity + options; ~US$216m capex; senior-debt process also run Sourced
Fully funded (A$395m); FID taken; construction commenced; fi
K.Hill
Botswana · Mn (battery-grade)
US$481m Sourced
after-tax · Giyani K.Hill DFS (28 May 2026) 2026 · 0y
Afreximbank fit:Pending Yes — initial capex ~US$535m (incl contingency; total LOP ~US$679m). US EXIM letter of intent US$225m (2025, NON-BINDING, not converted as of the May-2026 DFS); remaining funding gap ~US$310m; IDC of South Africa (convertible loan, combined facilities up to ~ZAR329.9m) + ARCH Sustainable Resources Fund (~US$26m earlier) Sourced
DFS complete (May 2026); pre-construction; financing-gated (
Boundiali
Côte d'Ivoire · Au
US$475m Derived
after-tax · Aurum Boundiali PFS (11 Jun 2026 ASX ann 2026 · 0y
Afreximbank fit:Pending PFS-stage capex (AACE Class 4 +/-25%) — not captured this cycle; A$40.2m cash funds studies/discovery; construction financing to be arranged toward FID (late-Q4-2026) Sourced
PFS-complete + maiden Reserve + env certificates issued + li
Dugbe
Liberia · Au
US$436m Derived
after-tax · Pasofino Gold Dugbe FS (Jul 2022, NI 43- 2022 · 4y
Afreximbank fit:Pending Yes — ~US$397-435m construction capex; financing not yet secured; FS being updated to support a 2026 construction decision Sourced
FS-update + pre-construction funding (Nioko/Hummingbird); co
Enchi
Ghana · Au
US$434m Derived
after-tax · Newcore Gold Enchi PFS (24 Jun 2026 Glob 2026 · 0y
Afreximbank fit:Pending Upfront capex ~US$351m (5.5Mtpa CIL, 24-month build, contract mining); 'fully funded to complete the PFS'; construction financing to be arranged Sourced
PFS-complete (Jun 2026); mining-lease application this year;
Baniaka
Gabon · Fe
US$391m Sourced
after-tax · Genmin Baniaka PFS (16 Nov 2022) 2022 · 4y
Afreximbank fit:Pending Yes — Stage-1 capex ~US$200m (5Mtpa); funding gap ~US$197.9m; reliant on director/non-exec loans for opex; A$25.7m raised late-2025 Sourced
Fully permitted + early civil works; PRE-DFS / pre-FID (FID
Songwe Hill
Malawi · REE (NdPr)
US$387m Derived
after-tax · Mkango Resources updated DFS (Mar 2026); 2026 · 0y
Afreximbank fit:Pending Yes — junior; U.S. DFC already funding FEED (US$4.6m, Sep 2025); project-finance package to follow Sourced
DFC FEED funding secured; NASDAQ SPAC merger (Crown PropTech
Chilalo
Tanzania · graphite
US$338m Sourced
after-tax · Evolution Energy Chilalo updated DFS (Ma 2023 · 3y
Afreximbank fit:Pending Yes — US$120m capex; debt process run by Auramet International; non-binding EOIs from European/African/Tanzanian banks, MULTILATERAL institutions, funds and strategics Sourced
DFS+FEED+ML in hand; FID-ready; financing-gated (debt proces
Makuutu
Uganda · REE (HREE)
US$278m Sourced
after-tax · Ionic Rare Earths Makuutu Stage 1 DFS (M 2023 · 3y
Afreximbank fit:Pending Yes — ~US$120.8m Stage-1 capex; financing is the explicit gating factor for FID; no DFI/binding finance committed Sourced
DFS + ML in hand; demo plant (Phase 1, Mar 2025) producing M
Muntanga
Zambia · U3O8
US$243m Sourced
after-tax · GoviEx Muntanga FS (23 Jan 2025 results 2025 · 1y
Afreximbank fit:Pending Yes — capex ~US$282m (heap-leach); financing-gated; LOIs from financing institutions received; advisor (Endeavour Financial) appointed; no DFI named Sourced
FS-complete + fully permitted + ESIA/RAP approved (Jun 2026)
Lofdal
Namibia · REE (HREE: Dy/Tb/Y)
US$232m Derived
after-tax · Namibia Critical Metals Lofdal PFS (Dec 2025 · 1y
Afreximbank fit:Pending Capex ~US$348m (Dec-2025 PFS, 100%-equity-financed basis); JOGMEC funds the earn-in (C$10m staged + C$3m DFS top-up), can provide non-dilutive Pre-FID capital, and has a ROFR to FULLY FUND through commercial production Sourced
PFS-complete + fully permitted; DFS underway (JOGMEC-funded,
Sanankoro
Mali · Au
US$221m Sourced
after-tax · Cora Gold Sanankoro updated DFS (Sep 202 2025 · 1y
Afreximbank fit:Pending Met commercially — US$124m capex; fully funded by EEA US$120m gold stream + ~£15.7m EEA-led equity, pending permit Sourced
Fully funded to production (EEA stream + equity), pending th
Ancuabe
Mozambique · graphite
Absent
pre-tax · Triton Ancuabe DFS (Dec 2017 / 2024 upda 2024 · 2y
Afreximbank fit:Pending Total project cost ~US$90.3m (updated DFS 2024, down from US$99.4m); financing not yet secured; Argonaut financial adviser; FID pending Sourced
DFS-complete + concession + env approval; FID 2025-2026 pend
Bekisopa
Madagascar · Fe
Absent
pre-tax · AKORA Bekisopa PFS (31 Mar 2025) 2025 · 1y
Afreximbank fit:Pending Low — start-up capex ~US$60.6m (capital-light: contract mining + mobile processing); raised A$2.91m (Aug 2025) for DFS/EIA/permitting; construction financing to be arranged Sourced
PFS-complete; DFS + EIA + mining-licence application underwa
Boumadine
Morocco · AuEq (gold-silver-zinc-lead polymetallic)
Absent
PEA · Aya Gold & Silver Boumadine PEA (4 Nov 2 2025 · 1y
Afreximbank fit:Pending Future construction capital not yet defined at FS level; Aya self-funds studies from Zgounder operating cashflow + market; PEA-stage Sourced
PEA-complete (Nov 2025); FS work underway (360,000m infill d
Bunyu (Stage 1)
Tanzania · graphite
Absent
pre-tax · Volt Bunyu Stage-1 FS update (Aug 2023) 2023 · 3y
Afreximbank fit:Pending Revised Stage-1 target capex ~US$37m (40,000 tpa 94% TGC concentrate, US$450/t opex FOB Mtwara); UOF US$11.1m equity conditional on, among others, 70% non-recourse project debt and >=80% bankable offtake Sourced
Development/financing phase; UOF binding term sheet (Dec 202
Epanko
Tanzania · graphite
Absent
pre-tax · EcoGraf Epanko updated BFS (Feb 2026) 2026 · 0y
Afreximbank fit:Pending Yes, DFI-led — US$181.2m construction + US$18.1m RAP; KfW IPEX-Bank mandated for a US$105m senior secured loan (IER completed); EIB technical assistance; EU infrastructure co-financing Sourced
BFS + IER complete; debt financing advancing (KfW IPEX-led U
Haib
Namibia · Cu
Absent
PEA · Koryx Haib PEA (4 Sep 2025) 2025 · 1y
Afreximbank fit:Pending Yes, large — PEA upfront capex ~US$1.56bn (incl 10% contingency) for a junior; financing steps come after PFS (late-2026)/DFS Sourced
PEA-complete + updated MRE; ESIA underway; PFS late-2026, th
Kalana
Mali · Au
Absent
after-tax · vintage Absent
Afreximbank fit: African jurisdictionPending None / N/A N/A
long / stalled HIGH Derived
Kandiolé
Mali · Au
Absent
PEA · Roscan Kandiolé PEA (eff. 27 Feb 2026; N 2026 · 0y
Afreximbank fit:Pending Initial capital US$218.7m; Roscan has no producing assets; financing discussions to start 2026 Sourced
PEA-complete + env permit granted; mining lease + DFS + fina
Kurmuk
Ethiopia · Au
after-tax · Allied Gold disclosures; Kristie Batten 2026 · 0y
Afreximbank fit: African jurisdictionPending None / N/A N/A
Self-funded (US$717m budget); pre-commissioning Q2-2026, fir
~0 (imminent) MEDIUM Derived
Minim Martap
Cameroon · bauxite
Absent
pre-tax · Canyon Minim Martap DFS (Aug 2025) 2025 · 1y
Afreximbank fit:Pending Modest + FUNDED — initial capex ~US$97m; Stage-1 fully financed to first shipment (commercial): ~US$140m AFG Bank Cameroon facility (~US$95m undrawn), A$215m Sept-2025 package (EEA + Afriland), ~A$40m cash Sourced
In construction, Stage-1 FULLY FUNDED to first shipment (Q3
Phalaborwa
South Africa · REE (NdPr+HREE)
Absent
PEA · Rainbow Phalaborwa Interim Study (Dec 20 2024 · 2y
Afreximbank fit:Pending Yes, US-backed — ~US$326m project; U.S. DFC proposed US$50m investment via TechMet (announced at COP28); US Govt identifies it as a REE supply-chain-independence contributor Sourced
DFS in progress (2026); pilot plant validating flowsheet; fi
Zanaga
Republic of Congo · Fe
Absent
after-tax · Zanaga Iron Ore Company FS (2024 update; 2026 · 0y
Afreximbank fit:Pending Very large — Apr-2026 update: Stage 1 capex ~US$2.17bn; combined Stage 1+2 ~US$4.05bn; infrastructure-heavy (must build a slurry pipeline + a NEW mining port north of Pointe-Noire; no mineral port exists) Sourced
Permitted + Apr-2026 economic update; pre-construction; pend

Shortlist = in-mandate ∩ bankability-complete ∩ deep-assessed ∩ financeability set. Mandate-fit column maps each institution to the closest published lens (African multilaterals → african-multilateral fit; IFC and DFC → the Western-DFI/ECA lens, an approximate proxy for IFC as a global multilateral; EBRD → its own accession status). It is a shown signal, not folded into the rank (which is DFI capital need, then NPV). Time-to-cashflow band is Derived editorial. This shortlist narrows a universe for origination; it is not an underwriting recommendation.

International Finance Corporation (World Bank Group)

Multilateral DFI · screening funnel, 159-asset roster

159In mandatesource ›
Geography gate — broad developing-country eligibility — confirm jurisdiction.
83Bankability-completesource ›
Of the in-mandate set, those with Sourced/Derived published economics (after-tax / pre-tax / PEA).
52Deep risk-assessedsource ›
Of those, assets carrying a downstream verdict (operating-flagship coverage) and/or a per-asset E&S safeguards screen (development-pipeline coverage) — two assessment layers over different universes, counted together. The bankable assets not in either are not-yet-assessed (Pending), not risk-rejected.
49Financeable shortlistsource ›
Of those, the diligence-grade financeability set — sponsor, capital need, funding status, offtake.

Financeable shortlist — 49 assets clearing all four layers (ranked by DFI capital need, then NPV)

IFC prioritises green-transition / critical minerals. Of the 49-asset shortlist, 21 are green-transition-class (battery/grid/magnet); the rest are geography-eligible but outside that priority. "Green-transition" here is narrower than the broad "critical minerals" sense (which also covers food-security minerals such as potash) used in the financeability commodity_class — complementary lenses, not a contradiction.

AssetBankability (NPV₈)Mandate fitDownstream verdictDFI capital need / fundingTime-to-cashflow
Kabanga
Tanzania · Ni-Cu-Co green-transition
US$1,579m Sourced
after-tax · Lifezone Metals FS TRS 2025 2025 · 1y
IFC fit: Financing parties engaged: US DFCPending High Sourced
In progress — DFC/EXIM/JOGMEC + SocGen PF package being fina
~4 yr MEDIUM Derived
Ewoyaa
Ghana · Li green-transition
US$1,500m Sourced
after-tax · Atlantic Lithium DFS (Jun 2023) + DFS Up 2023 · 3y
IFC fit: Control change pending: Huayou Cobalt t…Pending High Sourced
In transition — Huayou agreeing to sole-fund remaining devel
uncertain HIGH Derived
Kokoseb
Namibia · Au non-priority
US$555m Derived
after-tax · vintage Absent
IFC fit: No Western-DFI/ECA financing disclosedPending High Sourced
Equity-funded to date (A$30m placement Aug 2025); constructi
~2 yr LOW-MEDIUM Derived
Ngualla REE
Tanzania · REE green-transition
Pending
after-tax · Peak Rare Earths BFS Oct 2022 2022 · 4y
IFC fit: Controlling shareholder: Shenghe Resourcesno elevated downstream flag captured (some markers Pending) High Sourced
Shenghe-anchored; BFS-stage, FID pending — NdPr price (~$110
3-4+ yr MEDIUM Derived
Toliara (Vara Mada)
Madagascar · Mineral sands (Ti/Zr/REE) green-transition
US$1,720m Derived
after-tax · Energy Fuels Toliara/Vara Mada FS (Jan 2 2026 · 0y
IFC fit:Pending Large (~EUR854m / ~US$900m+ project) but the PARENT is well-capitalized: Energy Fuels raised US$700m convertible notes (Oct 2025, 7x oversubscribed), ~US$900m+ liquidity — the gate is REGULATORY (govt agreement), not capital Sourced
FS-complete; PRE-FID — FID requires a formalised govt invest
Assafou
Côte d'Ivoire · Au non-priority
US$1,715m Derived
after-tax · Endeavour Mining Assafou-Dibibango DFS ( 2026 · 0y
IFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
Early works launched (long-lead orders, detailed engineering
~3 yr LOW Derived
Mahenge
Tanzania · graphite green-transition
US$1,652m Derived
after-tax · Black Rock Mining eDFS update (FEED 2024 2026 · 0y
IFC fit:Pending Yes — and largely met: DBSA + IDC + CRDB facilities ~US$179-204m already committed; Module 1 capex ~US$182-231m Sourced
DBSA/IDC/CRDB debt + POSCO equity/offtake-prepayment; early
Kasiya
Malawi · rutile+graphite green-transition
≤US$1,448m Sourced
after-tax · Sovereign Metals Kasiya DFS (Apr 2026); 2026 · 0y
IFC fit:Pending Likely — junior developer, ~US$0.66bn+ initial capex; project finance not yet secured Derived
DFS-funded via A$40m (2025) raise; project financing not yet
Orom-Cross
Uganda · graphite non-priority
US$1,411m Derived
after-tax · Blencowe Orom-Cross optimised DFS (May 2 2026 · 0y
IFC fit:Pending Yes — phased, low capital intensity: Phase 1 ~US$40m (20ktpa concentrate, 1H-2027), Phase 2 ~US$120m (->70ktpa concentrate + 20ktpa USPG); ~US$160-170m total incl downstream beneficiation; P2 expansions from internal cashflow Sourced
DFS-complete + permitted; assembling P1 project finance (~US
Bankan
Guinea · Au non-priority
US$1,358m Derived
after-tax · Predictive Discovery Bankan DFS (Jun 202 2025 · 1y
IFC fit:Pending Capex ~US$463m (incl ~US$34m contingency); producing-asset cashflow supports but does not eliminate external funding; financing process commencing post-DFS Sourced
DFS-complete; ESIA approved; Exploitation Permit in final re
Afema
Côte d'Ivoire · Au non-priority
US$1,287m Derived
after-tax · Turaco Gold Afema PFS (17 Jun 2026 ASX a 2026 · 0y
IFC fit:Pending Total development capital US$410m (incl US$24m contingency + US$32m pre-strip); A$60m cash funds studies to FID; construction/project finance to be arranged toward FID Sourced
PFS-complete (Jun 2026) + maiden Reserve; DFS Q2-2027; first
Doropo
Côte d'Ivoire · Au non-priority
US$1,160m Derived
after-tax · DFS Dec 2025 2025 · 1y
IFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
FID taken Mar 2026; corporate/balance-sheet funded (Resolute
~2 yr LOW Derived
Steelpoortdrift
South Africa · Vanadium (V2O5) green-transition
US$1,159m Derived
after-tax · VR8 Steelpoortdrift DFS (Oct 2022) 2022 · 4y
IFC fit:Pending Yes — pre-production capex ~US$211m (Phase 1); seeking strategic equity + construction debt for FID; Rand Merchant Bank (RMB) appointed exclusive financial adviser; exploring brownfield-site acquisition to cut capex Sourced
DFS-complete + fully permitted; pre-FID (financing-gated); n
Etango
Namibia · U3O8 green-transition
US$1,070m Sourced
after-tax · Bannerman Energy Etango-8 updated DFS (A 2025 · 1y
IFC fit:Pending Partly filled commercially — CNNC (CNOL) to invest up to US$321.5m for 45% of the JV; build capex ~US$317-353m Sourced
Early works underway; CNNC JV US$321.5m (45%); FID guided 20
Kanyika
Malawi · Niobium (+Ta) non-priority
US$1,000m Sourced
after-tax · Globe Kanyika BFS (Apr 2026) 2026 · 0y
IFC fit:Pending Yes — BFS initial capex ~US$139m (A$197m); phased to cut upfront capital; A$8.67m raised 2025; multiple funding pathways being established; FID targeted 2026 Sourced
BFS-complete + fully permitted + early works begun; pre-FID
Nyanzaga
Tanzania · Au non-priority
US$977m Derived
after-tax · vintage Absent
IFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
FID Apr 2025; self-funded (Perseus cash); ~48% construction-
~0.5 yr LOW Derived
Dasa
Niger · U3O8 green-transition
US$917m Sourced
after-tax · Global Atomic Dasa 2024 Feasibility Stud 2024 · 2y
IFC fit:Pending Yes — total project cost US$424.6m (2024 DFS); ~US$250m already invested (meets US DFC 40% capital-contribution requirement); seeking a US development-bank loan for ~60% (debt/equity 60/40); US$100m+ still required Sourced
Under construction (~US$250m invested) but financing-gated f
Koné
Côte d'Ivoire · Au non-priority
US$889m Derived
after-tax · FS Jan 2024 2024 · 2y
IFC fit: No Western-DFI/ECA financing disclosedPending Moderate-High Sourced
FULLY FUNDED (Oct 2024 US$825m streaming+loan package); cons
<1 yr LOW Derived
Farim
Guinea-Bissau · phosphate non-priority
US$673m Derived
after-tax · Itafos Farim FS (May 2023) 2023 · 3y
IFC fit:Pending Yes — pre-production capex ~US$308m; FID pending for years (parent has prioritised its Brazil [Santana/Araxa] + Idaho [Conda] assets); no FID committed Sourced
FS-complete + fully permitted + ESIA done; PRE-FID (FID long
Bilboes
Zimbabwe · Au non-priority
US$582m Sourced
after-tax · Caledonia Bilboes Feasibility Study (Nov 2025 · 1y
IFC fit:Pending Peak funding requirement ~US$484m, primarily NON-RECOURSE senior debt + Blanket internal equity + royalties/streams/mezzanine/convertibles; NOT DFI-dependent Sourced
FID taken; ADVANCED commercial funding — US$150m convertible
Tumas
Namibia · U3O8 green-transition
US$577m Sourced
after-tax · Deep Yellow Tumas updated DFS (Apr 2025) 2025 · 1y
IFC fit:Pending Yes — ~US$474m capex; Nedbank Mandated Lead Arranger for ~US$350m debt; FID price-contingent Sourced
FID deferred Apr 2025 on uranium price; phased early works +
Waterberg
South Africa · PGM non-priority
US$569m Sourced
after-tax · Platinum Group Metals Waterberg 2024 DFS 2024 · 2y
IFC fit:Pending Yes — large bulk-mine capex; financing-gated. Funding to date via equity/ATM; Implats has not funded its share since early 2024 (slight dilution); MISA (Saudi) MoU for potential support of smelter/BMR + project Sourced
DFS-updated + Mining Right; pre-construction; financing-gate
Kangankunde
Malawi · REE (NdPr) green-transition
US$555m Sourced
after-tax · Lindian Resources Kangankunde Stage 1 FS 2024 · 2y
IFC fit:Pending Low and largely met — pre-production capex only ~US$40m; fully funded for Stage 1 via A$91.5m placement (Aug 2025) + Iluka US$20m loan Sourced
Fully funded Stage 1; in construction; first production targ
Twin Hills
Namibia · Au non-priority
US$552m Derived
after-tax · DFS 2023 2023 · 3y
IFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
Self-funded (Shanjin); construction commenced Sept 2025; fir
~0.5 yr LOW Derived
Douta
Senegal · Au non-priority
US$535m Derived
after-tax · Thor Explorations Douta PFS (Jan 2026) 2026 · 0y
IFC fit:Pending Initial development capital ~US$253.5m; ~US$137m cash on hand (end-2025) + Segilola cashflow; construction financing to be finalised Sourced
PFS-complete + ESIA approved; Mining Convention being finali
Kobada
Mali · Au non-priority
US$500m Sourced
after-tax · Toubani Resources Kobada updated DFS (Ma 2025 · 1y
IFC fit:Pending Met commercially — A$395m package (Oct 2025): EEA US$160m gold stream + A$125m equity + options; ~US$216m capex; senior-debt process also run Sourced
Fully funded (A$395m); FID taken; construction commenced; fi
K.Hill
Botswana · Mn (battery-grade) green-transition
US$481m Sourced
after-tax · Giyani K.Hill DFS (28 May 2026) 2026 · 0y
IFC fit:Pending Yes — initial capex ~US$535m (incl contingency; total LOP ~US$679m). US EXIM letter of intent US$225m (2025, NON-BINDING, not converted as of the May-2026 DFS); remaining funding gap ~US$310m; IDC of South Africa (convertible loan, combined facilities up to ~ZAR329.9m) + ARCH Sustainable Resources Fund (~US$26m earlier) Sourced
DFS complete (May 2026); pre-construction; financing-gated (
Boundiali
Côte d'Ivoire · Au non-priority
US$475m Derived
after-tax · Aurum Boundiali PFS (11 Jun 2026 ASX ann 2026 · 0y
IFC fit:Pending PFS-stage capex (AACE Class 4 +/-25%) — not captured this cycle; A$40.2m cash funds studies/discovery; construction financing to be arranged toward FID (late-Q4-2026) Sourced
PFS-complete + maiden Reserve + env certificates issued + li
Dugbe
Liberia · Au non-priority
US$436m Derived
after-tax · Pasofino Gold Dugbe FS (Jul 2022, NI 43- 2022 · 4y
IFC fit:Pending Yes — ~US$397-435m construction capex; financing not yet secured; FS being updated to support a 2026 construction decision Sourced
FS-update + pre-construction funding (Nioko/Hummingbird); co
Enchi
Ghana · Au non-priority
US$434m Derived
after-tax · Newcore Gold Enchi PFS (24 Jun 2026 Glob 2026 · 0y
IFC fit:Pending Upfront capex ~US$351m (5.5Mtpa CIL, 24-month build, contract mining); 'fully funded to complete the PFS'; construction financing to be arranged Sourced
PFS-complete (Jun 2026); mining-lease application this year;
Baniaka
Gabon · Fe non-priority
US$391m Sourced
after-tax · Genmin Baniaka PFS (16 Nov 2022) 2022 · 4y
IFC fit:Pending Yes — Stage-1 capex ~US$200m (5Mtpa); funding gap ~US$197.9m; reliant on director/non-exec loans for opex; A$25.7m raised late-2025 Sourced
Fully permitted + early civil works; PRE-DFS / pre-FID (FID
Songwe Hill
Malawi · REE (NdPr) green-transition
US$387m Derived
after-tax · Mkango Resources updated DFS (Mar 2026); 2026 · 0y
IFC fit:Pending Yes — junior; U.S. DFC already funding FEED (US$4.6m, Sep 2025); project-finance package to follow Sourced
DFC FEED funding secured; NASDAQ SPAC merger (Crown PropTech
Chilalo
Tanzania · graphite green-transition
US$338m Sourced
after-tax · Evolution Energy Chilalo updated DFS (Ma 2023 · 3y
IFC fit:Pending Yes — US$120m capex; debt process run by Auramet International; non-binding EOIs from European/African/Tanzanian banks, MULTILATERAL institutions, funds and strategics Sourced
DFS+FEED+ML in hand; FID-ready; financing-gated (debt proces
Makuutu
Uganda · REE (HREE) green-transition
US$278m Sourced
after-tax · Ionic Rare Earths Makuutu Stage 1 DFS (M 2023 · 3y
IFC fit:Pending Yes — ~US$120.8m Stage-1 capex; financing is the explicit gating factor for FID; no DFI/binding finance committed Sourced
DFS + ML in hand; demo plant (Phase 1, Mar 2025) producing M
Muntanga
Zambia · U3O8 green-transition
US$243m Sourced
after-tax · GoviEx Muntanga FS (23 Jan 2025 results 2025 · 1y
IFC fit:Pending Yes — capex ~US$282m (heap-leach); financing-gated; LOIs from financing institutions received; advisor (Endeavour Financial) appointed; no DFI named Sourced
FS-complete + fully permitted + ESIA/RAP approved (Jun 2026)
Lofdal
Namibia · REE (HREE: Dy/Tb/Y) green-transition
US$232m Derived
after-tax · Namibia Critical Metals Lofdal PFS (Dec 2025 · 1y
IFC fit:Pending Capex ~US$348m (Dec-2025 PFS, 100%-equity-financed basis); JOGMEC funds the earn-in (C$10m staged + C$3m DFS top-up), can provide non-dilutive Pre-FID capital, and has a ROFR to FULLY FUND through commercial production Sourced
PFS-complete + fully permitted; DFS underway (JOGMEC-funded,
Sanankoro
Mali · Au non-priority
US$221m Sourced
after-tax · Cora Gold Sanankoro updated DFS (Sep 202 2025 · 1y
IFC fit:Pending Met commercially — US$124m capex; fully funded by EEA US$120m gold stream + ~£15.7m EEA-led equity, pending permit Sourced
Fully funded to production (EEA stream + equity), pending th
Ancuabe
Mozambique · graphite green-transition
Absent
pre-tax · Triton Ancuabe DFS (Dec 2017 / 2024 upda 2024 · 2y
IFC fit:Pending Total project cost ~US$90.3m (updated DFS 2024, down from US$99.4m); financing not yet secured; Argonaut financial adviser; FID pending Sourced
DFS-complete + concession + env approval; FID 2025-2026 pend
Bekisopa
Madagascar · Fe non-priority
Absent
pre-tax · AKORA Bekisopa PFS (31 Mar 2025) 2025 · 1y
IFC fit:Pending Low — start-up capex ~US$60.6m (capital-light: contract mining + mobile processing); raised A$2.91m (Aug 2025) for DFS/EIA/permitting; construction financing to be arranged Sourced
PFS-complete; DFS + EIA + mining-licence application underwa
Boumadine
Morocco · AuEq (gold-silver-zinc-lead polymetallic) non-priority
Absent
PEA · Aya Gold & Silver Boumadine PEA (4 Nov 2 2025 · 1y
IFC fit:Pending Future construction capital not yet defined at FS level; Aya self-funds studies from Zgounder operating cashflow + market; PEA-stage Sourced
PEA-complete (Nov 2025); FS work underway (360,000m infill d
Bunyu (Stage 1)
Tanzania · graphite green-transition
Absent
pre-tax · Volt Bunyu Stage-1 FS update (Aug 2023) 2023 · 3y
IFC fit:Pending Revised Stage-1 target capex ~US$37m (40,000 tpa 94% TGC concentrate, US$450/t opex FOB Mtwara); UOF US$11.1m equity conditional on, among others, 70% non-recourse project debt and >=80% bankable offtake Sourced
Development/financing phase; UOF binding term sheet (Dec 202
Epanko
Tanzania · graphite green-transition
Absent
pre-tax · EcoGraf Epanko updated BFS (Feb 2026) 2026 · 0y
IFC fit:Pending Yes, DFI-led — US$181.2m construction + US$18.1m RAP; KfW IPEX-Bank mandated for a US$105m senior secured loan (IER completed); EIB technical assistance; EU infrastructure co-financing Sourced
BFS + IER complete; debt financing advancing (KfW IPEX-led U
Haib
Namibia · Cu non-priority
Absent
PEA · Koryx Haib PEA (4 Sep 2025) 2025 · 1y
IFC fit:Pending Yes, large — PEA upfront capex ~US$1.56bn (incl 10% contingency) for a junior; financing steps come after PFS (late-2026)/DFS Sourced
PEA-complete + updated MRE; ESIA underway; PFS late-2026, th
Kalana
Mali · Au non-priority
Absent
after-tax · vintage Absent
IFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
long / stalled HIGH Derived
Kandiolé
Mali · Au non-priority
Absent
PEA · Roscan Kandiolé PEA (eff. 27 Feb 2026; N 2026 · 0y
IFC fit:Pending Initial capital US$218.7m; Roscan has no producing assets; financing discussions to start 2026 Sourced
PEA-complete + env permit granted; mining lease + DFS + fina
Kurmuk
Ethiopia · Au non-priority
after-tax · Allied Gold disclosures; Kristie Batten 2026 · 0y
IFC fit: Parent Allied Gold under a pending Ziji…Pending None / N/A N/A
Self-funded (US$717m budget); pre-commissioning Q2-2026, fir
~0 (imminent) MEDIUM Derived
Minim Martap
Cameroon · bauxite non-priority
Absent
pre-tax · Canyon Minim Martap DFS (Aug 2025) 2025 · 1y
IFC fit:Pending Modest + FUNDED — initial capex ~US$97m; Stage-1 fully financed to first shipment (commercial): ~US$140m AFG Bank Cameroon facility (~US$95m undrawn), A$215m Sept-2025 package (EEA + Afriland), ~A$40m cash Sourced
In construction, Stage-1 FULLY FUNDED to first shipment (Q3
Phalaborwa
South Africa · REE (NdPr+HREE) green-transition
Absent
PEA · Rainbow Phalaborwa Interim Study (Dec 20 2024 · 2y
IFC fit:Pending Yes, US-backed — ~US$326m project; U.S. DFC proposed US$50m investment via TechMet (announced at COP28); US Govt identifies it as a REE supply-chain-independence contributor Sourced
DFS in progress (2026); pilot plant validating flowsheet; fi
Zanaga
Republic of Congo · Fe non-priority
Absent
after-tax · Zanaga Iron Ore Company FS (2024 update; 2026 · 0y
IFC fit:Pending Very large — Apr-2026 update: Stage 1 capex ~US$2.17bn; combined Stage 1+2 ~US$4.05bn; infrastructure-heavy (must build a slurry pipeline + a NEW mining port north of Pointe-Noire; no mineral port exists) Sourced
Permitted + Apr-2026 economic update; pre-construction; pend

Shortlist = in-mandate ∩ bankability-complete ∩ deep-assessed ∩ financeability set. Mandate-fit column maps each institution to the closest published lens (African multilaterals → african-multilateral fit; IFC and DFC → the Western-DFI/ECA lens, an approximate proxy for IFC as a global multilateral; EBRD → its own accession status). It is a shown signal, not folded into the rank (which is DFI capital need, then NPV). Time-to-cashflow band is Derived editorial. This shortlist narrows a universe for origination; it is not an underwriting recommendation.

U.S. International Development Finance Corporation

Bilateral DFI · screening funnel, 159-asset roster

159In mandatesource ›
Geography gate — broad developing-country eligibility — confirm jurisdiction.
83Bankability-completesource ›
Of the in-mandate set, those with Sourced/Derived published economics (after-tax / pre-tax / PEA).
52Deep risk-assessedsource ›
Of those, assets carrying a downstream verdict (operating-flagship coverage) and/or a per-asset E&S safeguards screen (development-pipeline coverage) — two assessment layers over different universes, counted together. The bankable assets not in either are not-yet-assessed (Pending), not risk-rejected.
49Financeable shortlistsource ›
Of those, the diligence-grade financeability set — sponsor, capital need, funding status, offtake.

Financeable shortlist — 49 assets clearing all four layers (ranked by DFI capital need, then NPV)

DFC prioritises green-transition / critical minerals. Of the 49-asset shortlist, 21 are green-transition-class (battery/grid/magnet); the rest are geography-eligible but outside that priority. "Green-transition" here is narrower than the broad "critical minerals" sense (which also covers food-security minerals such as potash) used in the financeability commodity_class — complementary lenses, not a contradiction.

AssetBankability (NPV₈)Mandate fitDownstream verdictDFI capital need / fundingTime-to-cashflow
Kabanga
Tanzania · Ni-Cu-Co green-transition
US$1,579m Sourced
after-tax · Lifezone Metals FS TRS 2025 2025 · 1y
DFC fit: Financing parties engaged: US DFCPending High Sourced
In progress — DFC/EXIM/JOGMEC + SocGen PF package being fina
~4 yr MEDIUM Derived
Ewoyaa
Ghana · Li green-transition
US$1,500m Sourced
after-tax · Atlantic Lithium DFS (Jun 2023) + DFS Up 2023 · 3y
DFC fit: Control change pending: Huayou Cobalt t…Pending High Sourced
In transition — Huayou agreeing to sole-fund remaining devel
uncertain HIGH Derived
Kokoseb
Namibia · Au non-priority
US$555m Derived
after-tax · vintage Absent
DFC fit: No Western-DFI/ECA financing disclosedPending High Sourced
Equity-funded to date (A$30m placement Aug 2025); constructi
~2 yr LOW-MEDIUM Derived
Ngualla REE
Tanzania · REE green-transition
Pending
after-tax · Peak Rare Earths BFS Oct 2022 2022 · 4y
DFC fit: Controlling shareholder: Shenghe Resourcesno elevated downstream flag captured (some markers Pending) High Sourced
Shenghe-anchored; BFS-stage, FID pending — NdPr price (~$110
3-4+ yr MEDIUM Derived
Toliara (Vara Mada)
Madagascar · Mineral sands (Ti/Zr/REE) green-transition
US$1,720m Derived
after-tax · Energy Fuels Toliara/Vara Mada FS (Jan 2 2026 · 0y
DFC fit:Pending Large (~EUR854m / ~US$900m+ project) but the PARENT is well-capitalized: Energy Fuels raised US$700m convertible notes (Oct 2025, 7x oversubscribed), ~US$900m+ liquidity — the gate is REGULATORY (govt agreement), not capital Sourced
FS-complete; PRE-FID — FID requires a formalised govt invest
Assafou
Côte d'Ivoire · Au non-priority
US$1,715m Derived
after-tax · Endeavour Mining Assafou-Dibibango DFS ( 2026 · 0y
DFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
Early works launched (long-lead orders, detailed engineering
~3 yr LOW Derived
Mahenge
Tanzania · graphite green-transition
US$1,652m Derived
after-tax · Black Rock Mining eDFS update (FEED 2024 2026 · 0y
DFC fit:Pending Yes — and largely met: DBSA + IDC + CRDB facilities ~US$179-204m already committed; Module 1 capex ~US$182-231m Sourced
DBSA/IDC/CRDB debt + POSCO equity/offtake-prepayment; early
Kasiya
Malawi · rutile+graphite green-transition
≤US$1,448m Sourced
after-tax · Sovereign Metals Kasiya DFS (Apr 2026); 2026 · 0y
DFC fit:Pending Likely — junior developer, ~US$0.66bn+ initial capex; project finance not yet secured Derived
DFS-funded via A$40m (2025) raise; project financing not yet
Orom-Cross
Uganda · graphite non-priority
US$1,411m Derived
after-tax · Blencowe Orom-Cross optimised DFS (May 2 2026 · 0y
DFC fit:Pending Yes — phased, low capital intensity: Phase 1 ~US$40m (20ktpa concentrate, 1H-2027), Phase 2 ~US$120m (->70ktpa concentrate + 20ktpa USPG); ~US$160-170m total incl downstream beneficiation; P2 expansions from internal cashflow Sourced
DFS-complete + permitted; assembling P1 project finance (~US
Bankan
Guinea · Au non-priority
US$1,358m Derived
after-tax · Predictive Discovery Bankan DFS (Jun 202 2025 · 1y
DFC fit:Pending Capex ~US$463m (incl ~US$34m contingency); producing-asset cashflow supports but does not eliminate external funding; financing process commencing post-DFS Sourced
DFS-complete; ESIA approved; Exploitation Permit in final re
Afema
Côte d'Ivoire · Au non-priority
US$1,287m Derived
after-tax · Turaco Gold Afema PFS (17 Jun 2026 ASX a 2026 · 0y
DFC fit:Pending Total development capital US$410m (incl US$24m contingency + US$32m pre-strip); A$60m cash funds studies to FID; construction/project finance to be arranged toward FID Sourced
PFS-complete (Jun 2026) + maiden Reserve; DFS Q2-2027; first
Doropo
Côte d'Ivoire · Au non-priority
US$1,160m Derived
after-tax · DFS Dec 2025 2025 · 1y
DFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
FID taken Mar 2026; corporate/balance-sheet funded (Resolute
~2 yr LOW Derived
Steelpoortdrift
South Africa · Vanadium (V2O5) green-transition
US$1,159m Derived
after-tax · VR8 Steelpoortdrift DFS (Oct 2022) 2022 · 4y
DFC fit:Pending Yes — pre-production capex ~US$211m (Phase 1); seeking strategic equity + construction debt for FID; Rand Merchant Bank (RMB) appointed exclusive financial adviser; exploring brownfield-site acquisition to cut capex Sourced
DFS-complete + fully permitted; pre-FID (financing-gated); n
Etango
Namibia · U3O8 green-transition
US$1,070m Sourced
after-tax · Bannerman Energy Etango-8 updated DFS (A 2025 · 1y
DFC fit:Pending Partly filled commercially — CNNC (CNOL) to invest up to US$321.5m for 45% of the JV; build capex ~US$317-353m Sourced
Early works underway; CNNC JV US$321.5m (45%); FID guided 20
Kanyika
Malawi · Niobium (+Ta) non-priority
US$1,000m Sourced
after-tax · Globe Kanyika BFS (Apr 2026) 2026 · 0y
DFC fit:Pending Yes — BFS initial capex ~US$139m (A$197m); phased to cut upfront capital; A$8.67m raised 2025; multiple funding pathways being established; FID targeted 2026 Sourced
BFS-complete + fully permitted + early works begun; pre-FID
Nyanzaga
Tanzania · Au non-priority
US$977m Derived
after-tax · vintage Absent
DFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
FID Apr 2025; self-funded (Perseus cash); ~48% construction-
~0.5 yr LOW Derived
Dasa
Niger · U3O8 green-transition
US$917m Sourced
after-tax · Global Atomic Dasa 2024 Feasibility Stud 2024 · 2y
DFC fit:Pending Yes — total project cost US$424.6m (2024 DFS); ~US$250m already invested (meets US DFC 40% capital-contribution requirement); seeking a US development-bank loan for ~60% (debt/equity 60/40); US$100m+ still required Sourced
Under construction (~US$250m invested) but financing-gated f
Koné
Côte d'Ivoire · Au non-priority
US$889m Derived
after-tax · FS Jan 2024 2024 · 2y
DFC fit: No Western-DFI/ECA financing disclosedPending Moderate-High Sourced
FULLY FUNDED (Oct 2024 US$825m streaming+loan package); cons
<1 yr LOW Derived
Farim
Guinea-Bissau · phosphate non-priority
US$673m Derived
after-tax · Itafos Farim FS (May 2023) 2023 · 3y
DFC fit:Pending Yes — pre-production capex ~US$308m; FID pending for years (parent has prioritised its Brazil [Santana/Araxa] + Idaho [Conda] assets); no FID committed Sourced
FS-complete + fully permitted + ESIA done; PRE-FID (FID long
Bilboes
Zimbabwe · Au non-priority
US$582m Sourced
after-tax · Caledonia Bilboes Feasibility Study (Nov 2025 · 1y
DFC fit:Pending Peak funding requirement ~US$484m, primarily NON-RECOURSE senior debt + Blanket internal equity + royalties/streams/mezzanine/convertibles; NOT DFI-dependent Sourced
FID taken; ADVANCED commercial funding — US$150m convertible
Tumas
Namibia · U3O8 green-transition
US$577m Sourced
after-tax · Deep Yellow Tumas updated DFS (Apr 2025) 2025 · 1y
DFC fit:Pending Yes — ~US$474m capex; Nedbank Mandated Lead Arranger for ~US$350m debt; FID price-contingent Sourced
FID deferred Apr 2025 on uranium price; phased early works +
Waterberg
South Africa · PGM non-priority
US$569m Sourced
after-tax · Platinum Group Metals Waterberg 2024 DFS 2024 · 2y
DFC fit:Pending Yes — large bulk-mine capex; financing-gated. Funding to date via equity/ATM; Implats has not funded its share since early 2024 (slight dilution); MISA (Saudi) MoU for potential support of smelter/BMR + project Sourced
DFS-updated + Mining Right; pre-construction; financing-gate
Kangankunde
Malawi · REE (NdPr) green-transition
US$555m Sourced
after-tax · Lindian Resources Kangankunde Stage 1 FS 2024 · 2y
DFC fit:Pending Low and largely met — pre-production capex only ~US$40m; fully funded for Stage 1 via A$91.5m placement (Aug 2025) + Iluka US$20m loan Sourced
Fully funded Stage 1; in construction; first production targ
Twin Hills
Namibia · Au non-priority
US$552m Derived
after-tax · DFS 2023 2023 · 3y
DFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
Self-funded (Shanjin); construction commenced Sept 2025; fir
~0.5 yr LOW Derived
Douta
Senegal · Au non-priority
US$535m Derived
after-tax · Thor Explorations Douta PFS (Jan 2026) 2026 · 0y
DFC fit:Pending Initial development capital ~US$253.5m; ~US$137m cash on hand (end-2025) + Segilola cashflow; construction financing to be finalised Sourced
PFS-complete + ESIA approved; Mining Convention being finali
Kobada
Mali · Au non-priority
US$500m Sourced
after-tax · Toubani Resources Kobada updated DFS (Ma 2025 · 1y
DFC fit:Pending Met commercially — A$395m package (Oct 2025): EEA US$160m gold stream + A$125m equity + options; ~US$216m capex; senior-debt process also run Sourced
Fully funded (A$395m); FID taken; construction commenced; fi
K.Hill
Botswana · Mn (battery-grade) green-transition
US$481m Sourced
after-tax · Giyani K.Hill DFS (28 May 2026) 2026 · 0y
DFC fit:Pending Yes — initial capex ~US$535m (incl contingency; total LOP ~US$679m). US EXIM letter of intent US$225m (2025, NON-BINDING, not converted as of the May-2026 DFS); remaining funding gap ~US$310m; IDC of South Africa (convertible loan, combined facilities up to ~ZAR329.9m) + ARCH Sustainable Resources Fund (~US$26m earlier) Sourced
DFS complete (May 2026); pre-construction; financing-gated (
Boundiali
Côte d'Ivoire · Au non-priority
US$475m Derived
after-tax · Aurum Boundiali PFS (11 Jun 2026 ASX ann 2026 · 0y
DFC fit:Pending PFS-stage capex (AACE Class 4 +/-25%) — not captured this cycle; A$40.2m cash funds studies/discovery; construction financing to be arranged toward FID (late-Q4-2026) Sourced
PFS-complete + maiden Reserve + env certificates issued + li
Dugbe
Liberia · Au non-priority
US$436m Derived
after-tax · Pasofino Gold Dugbe FS (Jul 2022, NI 43- 2022 · 4y
DFC fit:Pending Yes — ~US$397-435m construction capex; financing not yet secured; FS being updated to support a 2026 construction decision Sourced
FS-update + pre-construction funding (Nioko/Hummingbird); co
Enchi
Ghana · Au non-priority
US$434m Derived
after-tax · Newcore Gold Enchi PFS (24 Jun 2026 Glob 2026 · 0y
DFC fit:Pending Upfront capex ~US$351m (5.5Mtpa CIL, 24-month build, contract mining); 'fully funded to complete the PFS'; construction financing to be arranged Sourced
PFS-complete (Jun 2026); mining-lease application this year;
Baniaka
Gabon · Fe non-priority
US$391m Sourced
after-tax · Genmin Baniaka PFS (16 Nov 2022) 2022 · 4y
DFC fit:Pending Yes — Stage-1 capex ~US$200m (5Mtpa); funding gap ~US$197.9m; reliant on director/non-exec loans for opex; A$25.7m raised late-2025 Sourced
Fully permitted + early civil works; PRE-DFS / pre-FID (FID
Songwe Hill
Malawi · REE (NdPr) green-transition
US$387m Derived
after-tax · Mkango Resources updated DFS (Mar 2026); 2026 · 0y
DFC fit:Pending Yes — junior; U.S. DFC already funding FEED (US$4.6m, Sep 2025); project-finance package to follow Sourced
DFC FEED funding secured; NASDAQ SPAC merger (Crown PropTech
Chilalo
Tanzania · graphite green-transition
US$338m Sourced
after-tax · Evolution Energy Chilalo updated DFS (Ma 2023 · 3y
DFC fit:Pending Yes — US$120m capex; debt process run by Auramet International; non-binding EOIs from European/African/Tanzanian banks, MULTILATERAL institutions, funds and strategics Sourced
DFS+FEED+ML in hand; FID-ready; financing-gated (debt proces
Makuutu
Uganda · REE (HREE) green-transition
US$278m Sourced
after-tax · Ionic Rare Earths Makuutu Stage 1 DFS (M 2023 · 3y
DFC fit:Pending Yes — ~US$120.8m Stage-1 capex; financing is the explicit gating factor for FID; no DFI/binding finance committed Sourced
DFS + ML in hand; demo plant (Phase 1, Mar 2025) producing M
Muntanga
Zambia · U3O8 green-transition
US$243m Sourced
after-tax · GoviEx Muntanga FS (23 Jan 2025 results 2025 · 1y
DFC fit:Pending Yes — capex ~US$282m (heap-leach); financing-gated; LOIs from financing institutions received; advisor (Endeavour Financial) appointed; no DFI named Sourced
FS-complete + fully permitted + ESIA/RAP approved (Jun 2026)
Lofdal
Namibia · REE (HREE: Dy/Tb/Y) green-transition
US$232m Derived
after-tax · Namibia Critical Metals Lofdal PFS (Dec 2025 · 1y
DFC fit:Pending Capex ~US$348m (Dec-2025 PFS, 100%-equity-financed basis); JOGMEC funds the earn-in (C$10m staged + C$3m DFS top-up), can provide non-dilutive Pre-FID capital, and has a ROFR to FULLY FUND through commercial production Sourced
PFS-complete + fully permitted; DFS underway (JOGMEC-funded,
Sanankoro
Mali · Au non-priority
US$221m Sourced
after-tax · Cora Gold Sanankoro updated DFS (Sep 202 2025 · 1y
DFC fit:Pending Met commercially — US$124m capex; fully funded by EEA US$120m gold stream + ~£15.7m EEA-led equity, pending permit Sourced
Fully funded to production (EEA stream + equity), pending th
Ancuabe
Mozambique · graphite green-transition
Absent
pre-tax · Triton Ancuabe DFS (Dec 2017 / 2024 upda 2024 · 2y
DFC fit:Pending Total project cost ~US$90.3m (updated DFS 2024, down from US$99.4m); financing not yet secured; Argonaut financial adviser; FID pending Sourced
DFS-complete + concession + env approval; FID 2025-2026 pend
Bekisopa
Madagascar · Fe non-priority
Absent
pre-tax · AKORA Bekisopa PFS (31 Mar 2025) 2025 · 1y
DFC fit:Pending Low — start-up capex ~US$60.6m (capital-light: contract mining + mobile processing); raised A$2.91m (Aug 2025) for DFS/EIA/permitting; construction financing to be arranged Sourced
PFS-complete; DFS + EIA + mining-licence application underwa
Boumadine
Morocco · AuEq (gold-silver-zinc-lead polymetallic) non-priority
Absent
PEA · Aya Gold & Silver Boumadine PEA (4 Nov 2 2025 · 1y
DFC fit:Pending Future construction capital not yet defined at FS level; Aya self-funds studies from Zgounder operating cashflow + market; PEA-stage Sourced
PEA-complete (Nov 2025); FS work underway (360,000m infill d
Bunyu (Stage 1)
Tanzania · graphite green-transition
Absent
pre-tax · Volt Bunyu Stage-1 FS update (Aug 2023) 2023 · 3y
DFC fit:Pending Revised Stage-1 target capex ~US$37m (40,000 tpa 94% TGC concentrate, US$450/t opex FOB Mtwara); UOF US$11.1m equity conditional on, among others, 70% non-recourse project debt and >=80% bankable offtake Sourced
Development/financing phase; UOF binding term sheet (Dec 202
Epanko
Tanzania · graphite green-transition
Absent
pre-tax · EcoGraf Epanko updated BFS (Feb 2026) 2026 · 0y
DFC fit:Pending Yes, DFI-led — US$181.2m construction + US$18.1m RAP; KfW IPEX-Bank mandated for a US$105m senior secured loan (IER completed); EIB technical assistance; EU infrastructure co-financing Sourced
BFS + IER complete; debt financing advancing (KfW IPEX-led U
Haib
Namibia · Cu non-priority
Absent
PEA · Koryx Haib PEA (4 Sep 2025) 2025 · 1y
DFC fit:Pending Yes, large — PEA upfront capex ~US$1.56bn (incl 10% contingency) for a junior; financing steps come after PFS (late-2026)/DFS Sourced
PEA-complete + updated MRE; ESIA underway; PFS late-2026, th
Kalana
Mali · Au non-priority
Absent
after-tax · vintage Absent
DFC fit: No Western-DFI/ECA financing disclosedPending None / N/A N/A
long / stalled HIGH Derived
Kandiolé
Mali · Au non-priority
Absent
PEA · Roscan Kandiolé PEA (eff. 27 Feb 2026; N 2026 · 0y
DFC fit:Pending Initial capital US$218.7m; Roscan has no producing assets; financing discussions to start 2026 Sourced
PEA-complete + env permit granted; mining lease + DFS + fina
Kurmuk
Ethiopia · Au non-priority
after-tax · Allied Gold disclosures; Kristie Batten 2026 · 0y
DFC fit: Parent Allied Gold under a pending Ziji…Pending None / N/A N/A
Self-funded (US$717m budget); pre-commissioning Q2-2026, fir
~0 (imminent) MEDIUM Derived
Minim Martap
Cameroon · bauxite non-priority
Absent
pre-tax · Canyon Minim Martap DFS (Aug 2025) 2025 · 1y
DFC fit:Pending Modest + FUNDED — initial capex ~US$97m; Stage-1 fully financed to first shipment (commercial): ~US$140m AFG Bank Cameroon facility (~US$95m undrawn), A$215m Sept-2025 package (EEA + Afriland), ~A$40m cash Sourced
In construction, Stage-1 FULLY FUNDED to first shipment (Q3
Phalaborwa
South Africa · REE (NdPr+HREE) green-transition
Absent
PEA · Rainbow Phalaborwa Interim Study (Dec 20 2024 · 2y
DFC fit:Pending Yes, US-backed — ~US$326m project; U.S. DFC proposed US$50m investment via TechMet (announced at COP28); US Govt identifies it as a REE supply-chain-independence contributor Sourced
DFS in progress (2026); pilot plant validating flowsheet; fi
Zanaga
Republic of Congo · Fe non-priority
Absent
after-tax · Zanaga Iron Ore Company FS (2024 update; 2026 · 0y
DFC fit:Pending Very large — Apr-2026 update: Stage 1 capex ~US$2.17bn; combined Stage 1+2 ~US$4.05bn; infrastructure-heavy (must build a slurry pipeline + a NEW mining port north of Pointe-Noire; no mineral port exists) Sourced
Permitted + Apr-2026 economic update; pre-construction; pend

Shortlist = in-mandate ∩ bankability-complete ∩ deep-assessed ∩ financeability set. Mandate-fit column maps each institution to the closest published lens (African multilaterals → african-multilateral fit; IFC and DFC → the Western-DFI/ECA lens, an approximate proxy for IFC as a global multilateral; EBRD → its own accession status). It is a shown signal, not folded into the rank (which is DFI capital need, then NPV). Time-to-cashflow band is Derived editorial. This shortlist narrows a universe for origination; it is not an underwriting recommendation.

Composed from mandate · bankability · downstream · safeguards · financeability · method · roster 159 assets · deep-assessed set 71 · v2.137.23
Layers 1–2 cover the full roster (breadth); layers 3–4 cover the curated diligence-grade set (depth). The narrowing between them is the platform's honest frontier, surfaced rather than hidden.